40 city guides available
Deck permit rules by city
Compare attachment, height, area and zoning triggers across cities.
Compare published municipal guidanceChoose what you’re planning. See how the permit rules differ in the city where you want to build.
Pick the work. We’ll show you the cities.
14 projects
Attachment, height, area and zoning triggers.
Secondary-suite, basement apartment and ARU permit paths.
Zoning, grading, approvals and addition permit packages.
Shed size exemptions, setbacks, plumbing triggers and zoning rules.
Basement finishing, structural, plumbing, walkout and second-unit permit triggers.
New opening, enlarged opening and same-size replacement rules.
Walkout, grading, setback and foundation requirements.
Foundation, excavation and engineering requirements.
Fixture, drain, water-service and plumbing permit triggers.
Garage size thresholds, plumbing, zoning and grading rules.
Re-shingling, roofing-material and structural-work rules.
Skylight and roof-framing permit triggers.
Solar permit, mounting and structural-review rules.
Retaining-wall height, access, grading and site-alteration rules.
Start with a city or a project. Combine both to find the published local guide.
Choose a city, a project, or both. Results include published guides only; missing coverage is not a permit exemption.
These are municipality-level guides, not an approval for a particular property. Address-level findings depend on available local datasets.
A useful reference, not just a list
Our city-by-city tables bring municipal answers, important conditions, reviewed source links and verification dates together. Share the direct table link or download the data as CSV.
Free project tools
Estimate paint and tile quantities using your actual measurements.
Choose the right question
A useful permit search starts with the actual work. Finishing a room, changing plumbing, altering structural elements and creating a separate dwelling are not interchangeable descriptions. Start with a project guide to see the relevant municipal conditions. Then use the address check for property context and follow the official application service for the final requirements.
BuildRules compares published city rules, not permissions granted to a particular property. Each city guide identifies what is supported by official sources and what still needs municipal confirmation.
40 city guides available
Compare attachment, height, area and zoning triggers across cities.
Compare published municipal guidance24 city guides available
Compare basement finishing, structural, plumbing, walkout and second-unit permit triggers across cities.
Compare published municipal guidance27 city guides available
Compare secondary-suite, basement apartment and ARU permit paths across cities.
Compare published municipal guidanceFrom the city to your property
Check a GTA address to reach the right city guide. Toronto properties also include mapped zoning and a property brief.