Toronto · Building & renovation
Toronto building permits.
Start with your project.
See what your work may require, what to prepare and which property details to check before you commit.
Find my project29 published project guides Official sources linked in every guide

Do you need a permit for a deck in Toronto?
Toronto requires a permit for a deck more than 60 cm (24 in) above adjacent ground level. Some uncovered platforms at or below 60 cm can be exempt, provided they do not form part of a required exit and comply with zoning.
Municipal guidance only. Your property's zoning and other applicable approvals may change the result.
Find your local permit answer
Start with a city or a project. Combine both to find the published local guide.
Choose a city, a project, or both. Results include published guides only; missing coverage is not a permit exemption.
29 published guides match your filters
- Toronto · Backwater valve
- Toronto · Basement apartment / secondary suite
- Toronto · Basement entrance / walkout
- Toronto · Basement renovation
- Toronto · Basement underpinning
- Toronto · Change of use
- Toronto · Deck
- Toronto · Driveway widening
Choose a city and project to narrow the results.
These are municipality-level guides, not an approval for a particular property. Address-level findings depend on available local datasets.
Find your starting point
What are you working on?
Choose a project to see the rule, the checklist and the source.
Showing 8 of 29 guides to explore
Basement apartment / secondary suite
Adding a second dwelling unit in an existing house follows Toronto’s secondary suite building permit route.
Guide reviewed 2026-10-23Read rules and sources 02Home addition
Yes. Toronto requires a building permit for an addition to an existing home. Confirm zoning and property constraints first; the City has a dedicated Small Residential Additions application with required plans, forms and a 2026 fee calculation.
Guide reviewed 2026-09-29Read rules and sources 03Deck
Toronto requires a permit for a deck more than 60 cm (24 in) above adjacent ground level. Some uncovered platforms at or below 60 cm can be exempt, provided they do not form part of a required exit and comply with zoning.
Guide reviewed 2026-11-12Read rules and sources 04Basement renovation
Toronto can exempt basement finishing if no structural or material alterations, additional dwelling unit or new plumbing are involved. A permit is required for significant changes such as structural work, a new basement entrance, underpinning, HVAC/plumbing alterations or adding a second suite.
Guide reviewed 2026-09-29Read rules and sources 05Shed / accessory structure
A detached, single-storey Toronto storage shed under 15 m² with no plumbing can qualify for a permit exemption if it is not attached to any other structure. At exactly 15 m², Toronto's own permit-required and exemption lists conflict; confirm directly with Toronto Building. Zoning applies either way.
Guide reviewed 2026-09-29Read rules and sources 06Garage / carport
A detached garage in Toronto generally needs a building permit if its area exceeds 10 m². An accessory structure attached to the house or containing plumbing requires a permit regardless of size. Attached garages follow the addition permit route.
Guide reviewed 2026-11-12Read rules and sources 07Garden suite
Yes. You need a Toronto building permit to build a new garden suite. Check your lot zoning, the size and location of the suite, fire access and tree protection before you finalize the design.
Guide reviewed 2026-11-09Read rules and sources 08Interior alteration
Use the interior alterations route when proposed work in a small residential building needs a building permit.
Guide reviewed 2026-09-30Read rules and sourcesBrowse all 29 project guides
Backwater valve
Yes. Toronto requires a permit to install a backwater valve.
Guide reviewed 2026-10-01Read rules and sources 10Basement entrance / walkout
Yes. Toronto has a dedicated building-permit route for constructing a new residential basement entrance.
Guide reviewed 2026-10-01Read rules and sources 11Basement underpinning
Underpinning an existing house foundation requires a building permit.
Guide reviewed 2026-09-30Read rules and sources 12Change of use
Yes. Toronto says a change of use can require a building permit even when no construction is proposed.
Guide reviewed 2026-10-01Read rules and sources 13Driveway widening
Yes when the work widens or alters a driveway across City property. Toronto requires a Street Work Permit before that work, and zoning or front-yard parking rules can add a separate approval check.
Guide reviewed 2026-10-01Read rules and sources 14Fence
Most Toronto residential fences have a 2.0 m height limit. Near the front street line, the limit drops to 1.2 m.
Guide reviewed 2026-10-11Read rules and sources 15Landscaping / interlocking stone
Replacing a front lawn with interlocking stone needs a landscaping review. Decorative paving and vehicle parking have different approval paths; paving the whole front yard must not be assumed permitted.
Guide reviewed 2026-10-19Read rules and sources 16Laneway suite
Yes. A new laneway suite requires a building permit.
Guide reviewed 2026-10-01Read rules and sources 17Mechanical / HVAC
It depends on the HVAC work. Toronto has a stand-alone Mechanical (HVAC) permit route, while some common equipment changes in a house are listed as not requiring a building permit.
Guide reviewed 2026-10-01Read rules and sources 18Multiplex conversion
Yes. Toronto has a building-permit route for converting an existing house to a duplex, triplex, fourplex, fiveplex or sixplex.
Guide reviewed 2026-10-23Read rules and sources 19New house
A building permit is required to construct a new detached, semi-detached or row house in Toronto.
Guide reviewed 2026-10-23Read rules and sources 20Plumbing / drain work
New or modified plumbing systems can require a permit. Simple repair or replacement of existing plumbing fixtures is listed as permit-exempt.
Guide reviewed 2026-10-01Read rules and sources 21Pool fence enclosure
For an outdoor swimming pool, Toronto requires a compliant pool enclosure and a Pool Fence Enclosure Permit. Start with an approved Zoning Certificate; the City also lists a narrow locked-cover exemption for some hot tubs.
Guide reviewed 2026-10-12Read rules and sources 22Residential demolition
Yes. Demolishing all or part of a building requires a permit. Toronto has a specific residential demolition route when a replacement house is planned.
Guide reviewed 2026-10-01Read rules and sources 23Retaining wall
It depends on height and where the wall is located or accessible.
Guide reviewed 2026-10-01Read rules and sources 24Roof replacement
Toronto does not require a building permit to replace existing roofing material if no structural work is involved. Changing roof framing, raising the roof or altering the structure is a different permit question.
Guide reviewed 2026-11-12Read rules and sources 25Skylight
Some skylight installations do not require a building permit when Toronto's listed small-building and structural conditions are met.
Guide reviewed 2026-10-01Read rules and sources 26Solar panels
It depends on the system. Toronto says rooftop solar greater than 5 m² needs a building permit, while free-standing ground-mounted solar generally does not require a building permit but must follow zoning.
Guide reviewed 2026-10-01Read rules and sources 27Sump pump
Toronto says a building permit is not required to install a sump pump.
Guide reviewed 2026-10-01Read rules and sources 28Wall removal / structural alteration
Toronto lists adding or removing walls that changes room sizes or uses as material alteration requiring a building permit. Confirm whether the wall is load-bearing before demolition and have structural changes designed as needed.
Guide reviewed 2026-11-12Read rules and sources 29Windows / doors
Toronto requires a permit to create, enlarge or relocate an exterior window or door opening. A same-size, same-location replacement can be exempt in a qualifying single-unit house if the support is unchanged and no new exit is created.
Guide reviewed 2026-11-12Read rules and sourcesA different starting point
What do you need to do?
Go straight to the task in front of you.
Do I need a permit?
Understand the triggers and exemptions before you plan the work.
Open guidePrepare a building permit application
Find the City guide, drawings, forms and submission steps for your project.
Open guideCheck a building permit’s status
Open the official City search for current applications and inspections.
Open guideLook up building permits by address
Search published Toronto records and find the City route for older drawings.
Open guideUnderstand permit fees
Review the fee guide and selected project estimates.
Open guideWork already started?
See what to do if a required permit may have been missed.
Open guideFrom question to next step
Know what to check.
Then move forward.
BuildRules helps you prepare. The City confirms permit requirements and issues approvals.
See how sources are reviewed- 01
Understand the project
Open a guide for the published rule, conditions and documents.
- 02
Check the property
Use the address check to review available property context and what still needs confirmation.
- 03
Prepare your next step
Follow the checklist and linked City instructions for your scope of work.