Project navigator / TorontoCompare project paths before you commit.Find the guide for the work you actually plan, then compare it with this project.Open navigator
Only guides with current source records in the BuildRules catalogue are shown. Other scopes may still require municipal confirmation; absence from this list does not mean an exemption.
Municipal decision table · Reviewed evidence
What changes the route for a Toronto secondary suite?
A new self-contained dwelling unit follows the City’s secondary-suite application guide, not the same scope as finishes-only basement work. Review the documents and cost classification together.
| What to check | Published City guidance | Official evidence |
|---|---|---|
| Application route | Use the project-specific City guide Confirm the requirements against the official guide linked below. | City of Toronto · Basement apartment / secondary suite application guide Source checked |
| 2026 secondary-suite fees | $11.53/m² + $56.33 per new unit The City secondary-suite guide lists a 2026 rate of $11.53/m² for Group C interior alterations and $56.33 for each new residential unit. The general permit schedule sets a $214.79 minimum and separate charges may apply. Toronto determines the actual fee from the submitted scope. | City of Toronto · Building Permit Fees, effective January 1, 2026 Source checked |
| Work classification | Not ordinary basement finishing Creating a new self-contained dwelling follows the secondary suite permit application guide. The lower finishes-only basement service index should not be assumed to cover a new unit. Relevant drawings and plumbing/mechanical applications must be assessed. | City of Toronto · Basement apartment / secondary suite application guide Source checked |
| Checking an existing apartment | Verify records and authorized use Buying a property with a finished basement apartment? Request the City permit and inspection records and confirm the authorized use with Toronto Building. A property report does not establish legal rental status. This is different from applying to create a new second suite. | City of Toronto · Property Information Report Source checked |
Conditions from the municipality’s reviewed guidance. Check the source and your project details before relying on an exemption.
- Use the project-specific City guide
Application route
Confirm the requirements against the official guide linked below.
Official City sourceCity of Toronto · Basement apartment / secondary suite application guide Source checked - $11.53/m² + $56.33 per new unit
2026 secondary-suite fees
The City secondary-suite guide lists a 2026 rate of $11.53/m² for Group C interior alterations and $56.33 for each new residential unit. The general permit schedule sets a $214.79 minimum and separate charges may apply. Toronto determines the actual fee from the submitted scope.
Official City sourceCity of Toronto · Building Permit Fees, effective January 1, 2026 Source checked - Not ordinary basement finishing
Work classification
Creating a new self-contained dwelling follows the secondary suite permit application guide. The lower finishes-only basement service index should not be assumed to cover a new unit. Relevant drawings and plumbing/mechanical applications must be assessed.
Official City sourceCity of Toronto · Basement apartment / secondary suite application guide Source checked - Verify records and authorized use
Checking an existing apartment
Buying a property with a finished basement apartment? Request the City permit and inspection records and confirm the authorized use with Toronto Building. A property report does not establish legal rental status. This is different from applying to create a new second suite.
Important exception. The fee note is published guidance, not an instant quote for an entire secondary-suite application. Confirm the applicable area, classification, minimum and additional charges with Toronto Building.
Before requesting a quote
Documents to bring or discuss
Bring your project scope and any existing plans. Confirm what the City actually requires before paying for new drawings.
- Existing and proposed floor plans
- Site plan
- Building sections and construction details
- Applicable mechanical and plumbing information
3 questions to ask a professional
- Which drawings and permit tasks are included?
- Who responds to City review requests?
- Who arranges required inspections?
These are possible documents, not a mandatory package. Business listings do not verify credentials or availability.
Next step · Applications and documents
How to apply and what to prepare.
These are filing instructions and preparation checks. They do not prove a building permit is required or exempted for your property.
Confirm the requirements against the official guide linked below.
Source · City of Toronto
Basement apartment / secondary suite application guide · Secondary suite application, required drawings, related mechanical/plumbing submissions and 2026 fees
Source checked Oct 14, 2026Open official sourceThe City secondary-suite guide lists a 2026 rate of $11.53/m² for Group C interior alterations and $56.33 for each new residential unit. The general permit schedule sets a $214.79 minimum and separate charges may apply. Toronto determines the actual fee from the submitted scope.
Source · City of Toronto
Building Permit Fees, effective January 1, 2026 · 2026 calculation SI × area, $214.79 minimum, Group C interior alterations $11.53/m², $56.33 per new residential unit, and separate related charges
Source checked Nov 12, 2026Open official sourceBuying a property with a finished basement apartment? Request the City permit and inspection records and confirm the authorized use with Toronto Building. A property report does not establish legal rental status. This is different from applying to create a new second suite.
Source · City of Toronto
Property Information Report · Toronto property permit and inspection records
Source checked Oct 23, 2026Open official sourceTake it with you
Prepare the project and compare written quotes.
Free working documents to fill in or print. Confirm the applicable requirements with the municipality.
Make a start
Your preparation checklist
Basement apartment / secondary suite
Planning record, not municipal approval. Confirm the conditions and official requirements for your property.
0 of 4 ready
Your progress is saved in this browser. Project reference, date and notes stay in this tab until you leave.
Plan ahead
Fees and timing
Review timeline
Confirm the review stream after defining the project.
Permit fees
Toronto’s 2026 Secondary Suites application guide lists an $11.53/m² service-index rate for Group C interior alterations and a separate $56.33 fee for each new residential unit included in an application.
Read all fee conditions
Toronto’s general building-permit schedule lists a minimum fee of $214.79 for work and uses the relevant service index multiplied by the floor area of the proposed work unless specified otherwise. Do not use the $6.20/m² finishes-only basement rate for a new separate dwelling unit. Classification, unit fee, minimum, and any related plumbing, mechanical, revision or other approval charges require a complete scope and City confirmation. BuildRules also offers a separate 2026 Toronto permit-fees calculator for selected other project types; it does not currently calculate a complete secondary-suite permit package.
From reading to doing
Your next steps.
Follow the practical steps in the published Toronto guide. Confirm unresolved details with the City before committing to work.
Define the second unit and shared areas
Review the City’s secondary suite guide
Confirm the complete submission package with your designer
Checking an existing basement apartment? Request the City's permit and inspection records and verify the unit's authorized use before relying on it in a purchase.
Trace the evidence
Official sources behind this guide.
These are the source documents linked in the rules above. Check the municipal authority for current requirements before submitting a project.
- City of Toronto
Basement apartment / secondary suite application guide · Secondary suite application, required drawings, related mechanical/plumbing submissions and 2026 fees
Source checked Oct 14, 2026
- City of Toronto
Building Permit Fees, effective January 1, 2026 · 2026 calculation SI × area, $214.79 minimum, Group C interior alterations $11.53/m², $56.33 per new residential unit, and separate related charges
Source checked Nov 12, 2026
- City of Toronto
Property Information Report · Toronto property permit and inspection records
Source checked Oct 23, 2026
A little more clarity
Common questions.
Do you need a permit for a basement apartment or second suite in Toronto?
Yes. Adding a second dwelling unit in an existing house follows Toronto’s secondary suite building permit route. A basement apartment is a common example.
Is a Toronto basement renovation the same as a second suite?
No. Finishing a basement for personal use and creating a separate dwelling unit are different scopes. A second suite uses the City’s secondary-suite application guidance.
What drawings are typically prepared for a Toronto secondary suite application?
The City guide referenced by BuildRules covers existing and proposed floor plans, a site plan, building sections and construction details, plus applicable mechanical or plumbing information.
Can plumbing or mechanical work change the Toronto second-suite submission?
Yes. The City’s secondary-suite guide includes related mechanical or plumbing information when it applies to the proposed work.
How much is a Toronto secondary-suite building permit in 2026?
Toronto’s 2026 Secondary Suites guide lists $11.53 per m² for Group C interior alterations and an additional $56.33 per new residential unit in the application. The general permit schedule includes a $214.79 minimum fee. The final permit total depends on the exact classification, affected floor area, and any related permits or services.
Can I use the Toronto basement-finishing fee to estimate a new basement apartment?
No. Toronto’s schedule lists $6.20/m² for ordinary basement finishing, but a new secondary suite follows a separate application route. The City’s secondary-suite guide identifies interior-alteration and new-unit fees; confirm the project classification and full cost before applying.
Checking an existing basement apartment in Toronto: how do I know whether it is legal?
Do not treat a listing description, finished basement or absence of a permit in one search as proof. Request the seller's relevant permits, approved plans and inspection records, then ask Toronto Building how to confirm authorized use. The City's Property Information Report does not itself certify permitted use. BuildRules can organize published rules but cannot determine that a particular apartment is legally authorized.
Know the approval terms
A second unit can meet one rule and still need another approval.
Building permits, zoning and applicable law are separate parts of the approval path.
Building permit
A municipal approval required before certain construction, alteration, demolition or change-of-use work can proceed. The permit review checks the proposed work against the Ontario Building Code, local zoning and other applicable law.
Zoning by-law
A municipal rule set that controls how land and buildings may be used and developed, including matters such as permitted uses, setbacks, height, lot coverage and other site-specific standards.
Applicable law
Requirements outside the Ontario Building Code that must be satisfied before a building permit can be issued when the Building Code identifies them as applicable law.
Same project, different city
See how this rule changes across Ontario.
Compare the source-reviewed answer for this project across every municipality BuildRules currently covers.
Compare basement apartment / secondary suite rules by cityWhere are you in your project?
Looking up an existing permit or older drawings? Find Toronto building permit records by address.
Professional help
Find help with your basement apartment / secondary suite in Toronto.
Review the available options by city and project. Only a business with a claimed BuildRules profile can receive a direct referral, and responses are never guaranteed.
Get help with basement apartment / secondary suite