Toronto / Costs & budgeting

What will your Toronto building permit cost?

The short answer

The fee depends on the work category. In Toronto’s 2026 schedule, a residential deck permit is $214.79; selected area- and length-based categories use a rate and minimum. Use the calculator for one category, then build the rest of your project budget separately.

Architectural plans, an estimate worksheet, calculator and scale ruler on a dark desk

A permit fee and a renovation budget answer different questions. This guide helps you understand the municipal line item: which rate you selected, which quantity you measured and what the estimate leaves out. It does not estimate labour, materials or design services.

Start with a written scope rather than the cheapest-looking category. “Finish the basement” is not a complete description if the project also changes the foundation, adds plumbing or creates another dwelling unit. Take that scope to your designer or Toronto Building before treating an estimate as a final fee.

Calculate one selected permit fee

Select the category and inspect the calculation. The rates and worked examples are also listed below.

A clearer starting budget

Toronto 2026 schedule. One selected fee only, not the full municipal bill or construction budget. Additional applications, drawings and reviews may cost extra. Read the official City fee schedule.

Estimated selected fee · CADPlan with a number.

Choose a work category to see the fee and how it is calculated.

Four selected rates, with the units visible

These are the four categories supported by the calculator. Toronto’s full schedule contains many other classifications. Rates below are in Canadian dollars and effective January 1, 2026.

Selected Toronto building permit fees, 2026
Work categoryRateCalculator treatment
Residential deck, porch or carport$214.79Flat fee
Single-family detached garage / accessory structure$214.79 eachOne structure
Basement finishing in a dwelling / townhouse$6.20 per m²Area × rate; minimum $214.79
Underpinning$12.37 per linear metreLength × rate; minimum $214.79
BuildRules / Visual guideBuild the estimate in the right orderA single City permit fee is one line item, not a complete renovation budget.
  1. Define the work

    Identify every relevant permit category before choosing a rate.

  2. Find the correct unit

    Flat fee, area, length or another published measure.

  3. Calculate the selected fee

    Apply the documented rate and any relevant minimum.

  4. Budget separately

    Keep drawings, labour, materials and other approvals outside that figure.

Figures in the fee calculator apply only to its named categories and source-reviewed schedule.

Read the official sources (last reviewed 2026-09-30)

Read the calculation before using the result

For a supported area or length category, the calculator multiplies your quantity by the listed rate and applies the $214.79 minimum. A flat category uses the listed amount. Enter square metres for basement finishing and linear metres for underpinning; a number copied from a quote in square feet will produce the wrong estimate.

The examples below are arithmetic illustrations for a selected category. They do not establish that the category applies to your property or proposed work. Keep the quantity and calculation with your estimate so someone reviewing the budget can see what it represents.

Illustrative calculations for one supported category
Example inputCalculationSelected fee
20 m² of basement finishing20 × $6.20 = $124.00; minimum applies$214.79
50 m² of basement finishing50 × $6.20$310.00
30 linear metres of underpinning30 × $12.37$371.10

The permit question comes before the fee question

The City distinguishes finishes-only basement work from structural changes, services and additional dwelling units. It also lists a general deck permit trigger above 60 cm. A fee estimate cannot decide which of those descriptions fits your project.

For example, a basement quote may combine finishing, a new bathroom and lowering the floor. Writing those as separate scope lines makes it easier to ask which applications and fee categories are needed. BuildRules’ single-category estimate should stay labelled as one line in that budget, rather than becoming the total by accident.

Separate the municipal fee from the project budget

Make a small budget table with separate lines for this selected building permit fee, any related applications your project needs, and professional services. Add the designer’s or contractor’s own cost breakdown alongside it. This is a budgeting method, not a statement that every listed charge applies.

Before accepting a quote, ask who prepares the drawings, who submits the application, who pays the municipal fees and how changes to the scope are handled. A quote that says “permits included” is easier to compare once those responsibilities are written down.

For a deck application, Toronto’s guide identifies scaled drawings, site information and forms. Those documents are work to be prepared as well as items to upload. Keep their preparation costs separate from the City’s listed deck permit fee.

Your next steps

  1. Write the proposed scope in separate work categories.
  2. Choose the supported category and enter the correct unit.
  3. Save the rate, quantity and calculation with your budget.
  4. Confirm classification and the complete fee total with Toronto Building.

Toronto permit planning

Where are you in your project?

Looking up an existing permit or older drawings? Find Toronto building permit records by address.

Common questions

Is this the cost of my entire renovation?

No. It is an estimate for one selected municipal building permit fee. Keep design, construction and any other applicable charges on separate budget lines.

What if my project does not fit one of the four choices?

Use the full official schedule and ask Toronto Building to confirm the classification. Choosing a roughly similar category can create a misleading budget.

Sources & review

Guide reviewed 2026-09-30. Individual source review dates are listed below. The municipality and applicable rules determine requirements for your project.