Ontario / City comparison
Plumbing permits by city
Compare plumbing permit rules across Ontario cities for new fixtures, relocated fixtures, drains, water services and plumbing-only work.
Compare municipal requirements.
Compare published answers without switching pages. Every municipality has its own guide and source trail. Address checks are currently available only for supported GTA cities.
Every answer comes from the published city guide. Review the official source before relying on a threshold or exemption for a specific property.
| Municipality | The local answer | Key conditions to check | Sources & review |
|---|---|---|---|
TorontoOntario Reviewed 2026-10-01 | New or modified plumbing systems can require a permit. Simple repair or replacement of existing plumbing fixtures is listed as permit-exempt. |
Conditions & official source
When Do I Need a Building Permit? Reviewed 2026-10-01 | When Do I Need a Building Permit? Source reviewed: 2026-11-12 City of TorontoGuide reviewed: 2026-10-01 |
BramptonOntario Reviewed 2026-11-12 | Brampton generally requires a building permit when installing or altering plumbing, including new fixtures and finishing roughed-in plumbing. Replacing fixtures without changing regulated plumbing may fall under an exemption. |
Conditions & official source
Homeowners and Residential Contractors Reviewed 2026-11-12 | Homeowners and Residential Contractors Source reviewed: 2026-11-12 City of BramptonGuide reviewed: 2026-11-12 |
CambridgeOntario Reviewed 2026-10-29 | Cambridge lists plumbing, drains and installation or repair of storm, sanitary or water services among work requiring a building permit. |
Conditions & official source
Building Permits Reviewed 2026-10-29 | Building Permits Source reviewed: 2026-11-09 City of CambridgeGuide reviewed: 2026-10-29 |
HamiltonOntario Reviewed 2026-10-01 | Hamilton requires a building permit for plumbing work inside buildings, and plumbing/drainage systems are reviewed under the Building Code. |
Conditions & official source
Building Permit Application Requirements Reviewed 2026-10-01 | Building Permit Application Requirements Source reviewed: 2026-10-01 City of HamiltonGuide reviewed: 2026-10-01 |
KitchenerOntario Reviewed 2026-11-09 | Kitchener requires a building permit when plumbing fixtures are added or moved. Replacing a plumbing fixture, such as a sink, bath or toilet, in the same location is listed as exempt, and installing a water softener is also listed as exempt. New drains, fixtures and site services must be classified by the City's Building Services team. |
Conditions & official source
When you need a building permit Reviewed 2026-11-09 | When you need a building permit Source reviewed: 2026-11-09 City of KitchenerGuide reviewed: 2026-11-09 |
LondonOntario Reviewed 2026-11-09 | London requires a permit for adding, removing or relocating plumbing fixtures and for regulated plumbing drainage changes; replacing a fixture in the same location is listed as permit-exempt. Under the City's March 2026 B-7 by-law, certain standalone buried-water/sanitary/storm-pipe work in a single/semi-detached house costs $260.37 flat, and a sanitary backwater valve is a separate $260.37 item. |
Conditions & official source
Before you apply for a building permit Reviewed 2026-11-09 | Before you apply for a building permit Source reviewed: 2026-11-09 City of LondonGuide reviewed: 2026-11-09 |
MississaugaOntario Reviewed 2026-10-01 | Adding, removing or relocating plumbing fixtures and installing, replacing or repairing plumbing drainage require a permit; same-location fixture replacement is listed as permit-exempt. |
Conditions & official source
When a building permit is required Reviewed 2026-10-01 | When a building permit is required Source reviewed: 2026-10-01 City of MississaugaGuide reviewed: 2026-10-01 |
OshawaOntario Reviewed 2026-11-09 | Oshawa requires building permits for new, moved or altered plumbing systems and routes 'plumbing only', sump pumps, backflow devices and site services through its Plumbing application category. Replacing a plumbing fixture is listed as exempt when no additional regulated work is involved. The 2026 bylaw lists $27 per house plumbing fixture, $82 per sump or backflow item and a $160 general minimum permit charge. |
Conditions & official source
Building Permits Reviewed 2026-11-09 | Building Permits Source reviewed: 2026-11-09 City of OshawaGuide reviewed: 2026-11-09 |
OttawaOntario Reviewed 2026-11-12 | Ottawa requires a building permit for plumbing system alterations, additions or extensions, while replacing existing fixtures without modifying the plumbing is listed as exempt. |
Conditions & official source
Building permit projects Reviewed 2026-11-12 | Building permit projects Source reviewed: 2026-10-01 City of OttawaGuide reviewed: 2026-11-12 |
VaughanOntario Reviewed 2026-10-01 | Vaughan requires a building permit for additions or alterations to plumbing fixtures, water services and sewer services. |
Conditions & official source
Plumbing Reviewed 2026-10-01 | Plumbing Source reviewed: 2026-10-01 City of VaughanGuide reviewed: 2026-10-01 |
WaterlooOntario Reviewed 2026-11-09 | Waterloo lists replacing a plumbing fixture with the same type in the same location as permit-exempt. Adding, removing or moving plumbing fixtures is generally a building-permit project. For plumbing work independent of a larger building permit, the City publishes a fee of 1% of construction cost, subject to a $132 minimum application fee. |
Conditions & official source
Check if you need a building permit Reviewed 2026-11-09 | Check if you need a building permit Source reviewed: 2026-11-09 City of WaterlooGuide reviewed: 2026-11-09 |
WhitbyOntario Reviewed 2026-11-09 | Whitby lists plumbing and drains among work requiring a building permit. Its 2026 Schedule N charges $27.80 per plumbing fixture (BGP-59), $12.09 per linear metre of plumbing drain/water main (BGP-60), $122 per sump pump/interceptor item (BGP-61) and $242 per backflow preventer (BGP-62). The $305 minimum permit fee can apply, so the per-item price is not necessarily the total invoice. |
Conditions & official source
Building Permits: applications, mandatory documents, E-Portal submission by type Reviewed 2026-11-09 | Building Permits: applications, mandatory documents, E-Portal submission by type Source reviewed: 2026-11-09 Town of WhitbyGuide reviewed: 2026-11-09 |
Using these figures? Link to this comparison or the relevant city guide and include the review date. This is a research aid, not municipal approval or property-specific advice.
For reporting or research: Download CSV or View JSON with source links and review dates. Reuse terms apply to BuildRules-original content.
Ontario sets the Building Code. Municipal rules, zoning, processes and project guidance still differ.
We publish a city only after attaching municipal sources to the project answer. Missing coverage stays missing instead of borrowing another city’s rule.
From city rule to your address
Have a property in mind?
In supported GTA municipalities, enter the address once. BuildRules identifies the location and keeps your project context as you continue. For other Ontario cities, use the linked municipal guide.