Ontario Permit Cost Atlas / Source-reviewed guidance
Before you budget the permit,
check the city.
There is no single Ontario building permit price or approval date. Compare the published project guidance for each municipality, then open the original source before filing.
Compare project costs and timing
Start with the work you're planning.
Every note is drawn from a published BuildRules project guide. A blank dollar figure means no reliable fixed amount is provided in that guide—not that the permit is free.
Compare how two cities describe the same project
Two cities. Two municipal source trails.
Look at the published fee basis and timeline side by side. Different application classifications or extra reviews can make the numbers non-comparable. These are not quotes.
What the published guidance can actually tell you
A dollar amount is evidence from the reviewed guide, not a guaranteed final fee. Check the project classification and updated municipal schedule. Published review durations describe specific streams or conditions, not a promise of overall project completion. Additional charges, zoning reviews, other approvals and incomplete applications can change the actual total.
Deck
40 municipal guides with source-reviewed notes. Guides with published dollar amounts appear first; those figures still need current confirmation.
| Municipality | Fee guidance | Processing and timing | Evidence |
|---|---|---|---|
| BramptonDeck | Amount published in reviewed guideBrampton's February 2026 Building By-law and Deck Package state a flat $326.21 fee for a stand-alone residential deck… Read complete fee guidanceBrampton's February 2026 Building By-law and Deck Package state a flat $326.21 fee for a stand-alone residential deck permit. This is due only where a permit is required and excludes professional drawings, zoning/other approvals and construction costs. | Brampton's Standard Permit Application Service targets a review within 10 business days for a complete residential deck application. This is not a guarantee of final issuance; incomplete documents and other approvals can delay the project. | Review project guideRelated municipal source ↗Source review: |
| CaledonDeck | Amount published in reviewed guideCaledon's 2026 Schedule B lists $192 EACH for a residential deck, porch or basement walkout permit. The same by-law states… Read complete fee guidanceCaledon's 2026 Schedule B lists $192 EACH for a residential deck, porch or basement walkout permit. The same by-law states a general building-permit minimum of $193, so the total payable for a stand-alone deck can differ from the $192 line item. Confirm the actual minimum and any zoning or other charges with Building Services; do not treat either number as an all-in quote. | Caledon's official deck application page does not promise a fixed decision timeline. Complete zoning clearance first, upload required plans and forms through the Town's online portal and track correction requests. Other approvals or missing documents extend the total time. | Review project guideRelated municipal source ↗Source review: |
| ClaringtonDeck | Amount published in reviewed guideClarington's official Decks page lists $160.86 PER DECK as its published building-permit charge. Confirm the currently… Read complete fee guidanceClarington's official Decks page lists $160.86 PER DECK as its published building-permit charge. Confirm the currently assessed amount and any planning, zoning, other-approval or construction costs with Building Services before paying; the website's price is not an all-in quote. | Clarington does not promise a fixed total permit review time on its Decks page. Upload a complete application through Service Clarington, respond to zoning/building examiner comments and await issuance. Required inspections are footing before concrete, framing before deck boards and guardrails, and final once completed; arrange via 905-623-7876 (before 3 p.m. for next-day inspection requests). | Review project guideRelated municipal source ↗Source review: |
| MarkhamDeck | Amount published in reviewed guideIf a residential deck/accessory structure under 50 m² needs a minor setback variance without change of use, Markham… Read complete fee guidanceIf a residential deck/accessory structure under 50 m² needs a minor setback variance without change of use, Markham confirmed the Residential Small Scale Development Standards category (2026 Committee of Adjustment Table 7, 7.1.2; published fee $2,942). This application fee is separate from building-permit fees and from any Zoning Preliminary Review (ZPR) fee. A variance is NOT automatically required for a deck. Actual charges depend on the proposal and current fee schedule. | Confirm the current municipal review stage after the application is accepted as complete. | Review project guideRelated municipal source ↗Source review: |
| OttawaDeck | Amount published in reviewed guideOttawa's January 2026 Comprehensive Building Code Fee Schedule lists homeowner projects (including decks) at $12.75 per… Read complete fee guidanceOttawa's January 2026 Comprehensive Building Code Fee Schedule lists homeowner projects (including decks) at $12.75 per $1,000 or part thereof of construction valuation, with a $117 minimum fee. Actual assessment depends on the work and any other applicable charges; do not treat this as a fixed deck permit price. | Ottawa's Council-approved enhanced service level targets the first review within 5 business days for a complete small-homeowner-project permit application, including decks. This is a first review target, not a guaranteed permit issuance date. Building inspections must be scheduled as required. | Review project guideRelated municipal source ↗Source review: |
| PickeringDeck | Amount published in reviewed guidePickering's official July 1, 2026 City Development fee schedule lists $180 EACH for a stand-alone 'Minor Residential… Read complete fee guidancePickering's official July 1, 2026 City Development fee schedule lists $180 EACH for a stand-alone 'Minor Residential Structures and Alterations' permit, including decks, gazebos and pergolas. Pickering's minimum building-permit fee is also $180. This is the building-permit charge for the listed class, not an estimate of drawings, zoning, deposits, surcharges or construction. | Pickering's permit application page does not guarantee a specific deck permit decision date. Submit a complete electronic application, check for plan-examiner comments and ask Building Services for a current scope-specific review estimate; do not book construction against an assumed 10-day timeline. | Review project guideRelated municipal source ↗Source review: |
| TorontoDeck | Amount published in reviewed guideToronto's 2026 Building Permit Fees list $214.79 for a stand-alone Residential Deck, Porch or Carport permit where the… Read complete fee guidanceToronto's 2026 Building Permit Fees list $214.79 for a stand-alone Residential Deck, Porch or Carport permit where the project requires a permit. Zoning review, additional approvals and professional drawings can involve other costs; do not treat this as a total construction or approval quote. | Toronto Express Services says a complete eligible application is assigned examiner review within 3 days; if approved, permit issuance typically follows within one business day of receiving the fee. This does not apply to every deck, is not guaranteed and excludes missing documents, zoning problems and revisions. | Review project guideRelated municipal source ↗Source review: |
| VaughanDeck | Amount published in reviewed guideCity of Vaughan By-law 051-2026, Schedule F, lists a $280.00 flat 2026 building-permit fee per Part 9 'Deck, Covered Porch,… Read complete fee guidanceCity of Vaughan By-law 051-2026, Schedule F, lists a $280.00 flat 2026 building-permit fee per Part 9 'Deck, Covered Porch, Basement Walk-up' item, IF the proposed deck needs a permit. This is not a quote for all planning, drawings, construction or possible additional refundable security/returnable fees; the exact permit classification must be checked. The schedule lists a separate $515.00 returnable-fee category for qualifying residential accessory structures (or the permit fee if lower), and annual permit-maintenance charges may apply to permits that remain open. Source: City of Vaughan, 2026 Fees and Charges By-law 051-2026, Schedule F (reviewed Nov. 12, 2026). | Confirm the current municipal review stage after the application is accepted as complete. | Review project guideRelated municipal source ↗Source review: |
| AjaxDeck | Ajax's official building-permit application process says the applicant receives a project-specific permit-fee notice AFTER… Read complete fee guidanceAjax's official building-permit application process says the applicant receives a project-specific permit-fee notice AFTER a pre-screen passes. The municipal 2026 checklist does not state a single fixed deck fee. Confirm the amount in the Town's current Building By-law or pre-screen notice before budgeting; do not quote a generic Ontario amount. | Ajax's official Online Application Portal first prescreens the uploaded plans. The submission becomes a formal permit application only after passing prescreen, with the permit fee then notified; subsequent plan review may require resubmissions before approval. No fixed deck permit issuance timeline is guaranteed on the Town's published overview. | Review project guideRelated municipal source ↗Source review: |
| AuroraDeck | Confirm the current Aurora fee schedule for the exact permit class before filing. | Confirm the current municipal review timeline after a complete application is accepted. | Review project guideRelated municipal source ↗Source review: |
| BarrieDeck | Confirm the current Barrie permit fee for the exact project class before filing. | Confirm the current municipal review timeline after the application is accepted as complete. | Review project guideRelated municipal source ↗Source review: |
| Brock TownshipDeck | Confirm the current Brock fee schedule for the exact permit class before filing. | Confirm the current municipal review timeline after a complete application is accepted. | Review project guideRelated municipal source ↗Source review: |
| BurlingtonDeck | Confirm the current Burlington building permit fee schedule before filing. | Confirm the current municipal review stage after the application is accepted as complete. | Review project guideRelated municipal source ↗Source review: |
| East GarafraxaDeck | If a permit is required, Dufferin County requests payment through CityView after approval. Confirm the current amount with Building Services. | Confirm the current municipal service standard. | Review project guideRelated municipal source ↗Source review: |
| East GwillimburyDeck | Confirm the current East Gwillimbury fee schedule for the exact permit class before filing. | Confirm the current municipal review timeline after a complete application is accepted. | Review project guideRelated municipal source ↗Source review: |
| GeorginaDeck | Confirm the current Georgina fee schedule for the exact permit class before filing. | Confirm the current municipal review timeline after a complete application is accepted. | Review project guideRelated municipal source ↗Source review: |
| Grand ValleyDeck | If a permit is required, Dufferin County requests payment through CityView after approval. Confirm the current amount with Building Services. | Confirm the current municipal service standard. | Review project guideRelated municipal source ↗Source review: |
| Greater SudburyDeck | Greater Sudbury adjusts its fees annually. Ask Building Services to confirm the current fee for your application. | Confirm the current municipal service standard. | Review project guideRelated municipal source ↗Source review: |
| GuelphDeck | Check the current Guelph building permit fee schedule linked below. | Confirm the current municipal service standard. | Review project guideRelated municipal source ↗Source review: |
| Halton HillsDeck | Confirm the current Halton Hills fee schedule for the exact permit class before filing. | Confirm the current municipal review timeline after a complete application is accepted. | Review project guideRelated municipal source ↗Source review: |
| HamiltonDeck | Confirm the current Hamilton building permit fee schedule before filing. | Confirm the current municipal review stage after the application is accepted as complete. | Review project guideRelated municipal source ↗Source review: |
| King TownshipDeck | Confirm the current King Township fee schedule for the exact permit class before filing. | Confirm the current municipal review timeline after a complete application is accepted. | Review project guideRelated municipal source ↗Source review: |
| KingstonDeck | Check the current Kingston building permit fee schedule linked below. | Kingston lists a 10-business-day review for a complete deck application. | Review project guideRelated municipal source ↗Source review: |
| KitchenerDeck | Confirm the current Kitchener permit fee for the exact project class before filing. | Confirm the current municipal review timeline after the application is accepted as complete. | Review project guideRelated municipal source ↗Source review: |
| LondonDeck | Confirm the current London permit fee for the exact project class before filing. | London lists a 10-business-day statutory review timeline for decks servicing houses once the application is complete. | Review project guideRelated municipal source ↗Source review: |
| MelancthonDeck | If a permit is required, Dufferin County requests payment through CityView after approval. Confirm the current amount with Building Services. | Confirm the current municipal service standard. | Review project guideRelated municipal source ↗Source review: |
| MiltonDeck | Confirm the applicable Milton building permit fee from the municipality's current fee schedule. | Check Milton's current review timeline once a complete application is submitted. | Review project guideRelated municipal source ↗Source review: |
| MississaugaDeck | Permit fees depend on the project classification and scope. Confirm the current Mississauga fee schedule before filing. | Confirm the current City review stage and service level after the application is prescreened. | Review project guideRelated municipal source ↗Source review: |
| MonoDeck | If a permit is required, Dufferin County requests payment through CityView after approval. Confirm the current amount with Building Services. | Confirm the current municipal service standard. | Review project guideRelated municipal source ↗Source review: |
| MulmurDeck | If a permit is required, Dufferin County requests payment through CityView after approval. Confirm the current amount with Building Services. | Confirm the current municipal service standard. | Review project guideRelated municipal source ↗Source review: |
| NewmarketDeck | Confirm the current Newmarket fee schedule for the exact permit class before filing. | Confirm the current municipal review timeline after a complete application is accepted. | Review project guideRelated municipal source ↗Source review: |
| OakvilleDeck | Confirm the current Oakville building permit fee schedule before filing. | Confirm the current municipal review stage after the application is accepted as complete. | Review project guideRelated municipal source ↗Source review: |
| OshawaDeck | Confirm the current Oshawa permit fee for the exact project class before filing. | Confirm the current municipal review timeline after the application is accepted as complete. | Review project guideRelated municipal source ↗Source review: |
| Richmond HillDeck | Confirm the applicable Richmond Hill building permit fee from the municipality's current fee schedule. | Check Richmond Hill's current review timeline once a complete application is submitted. | Review project guideRelated municipal source ↗Source review: |
| ScugogDeck | Confirm the current Scugog fee schedule for the exact permit class before filing. | Confirm the current municipal review timeline after a complete application is accepted. | Review project guideRelated municipal source ↗Source review: |
| ShelburneDeck | If a permit is required, Dufferin County requests payment through CityView after approval. Confirm the current amount with Building Services. | Confirm the current municipal service standard. | Review project guideRelated municipal source ↗Source review: |
| StouffvilleDeck | Confirm the current Stouffville fee schedule for the exact permit class before filing. | Confirm the current municipal review timeline after a complete application is accepted. | Review project guideRelated municipal source ↗Source review: |
| UxbridgeDeck | Confirm the current Uxbridge fee schedule for the exact permit class before filing. | Confirm the current municipal review timeline after a complete application is accepted. | Review project guideRelated municipal source ↗Source review: |
| WaterlooDeck | Confirm the current Waterloo permit fee for the exact project class before filing. | Waterloo lists a 10-business-day processing timeline for decks serving houses once an application is complete. | Review project guideRelated municipal source ↗Source review: |
| WhitbyDeck | Confirm the current Whitby permit fee for the exact project class before filing. | Confirm the current municipal review timeline after the application is accepted as complete. | Review project guideRelated municipal source ↗Source review: |
Important: municipal permit fees may depend on the precise scope, construction value, area, additional charges and current fee schedule. A target review period is not an approval promise; incomplete applications, zoning and applicable-law reviews can change the timing. This index does not replace an official municipal quotation or decision.
Now make it property-specific
The same project can have different constraints at two addresses.
Use the property check to see the municipal route and available zoning context, then review the official instructions for the proposed work.
Understand what the index is showing.
Are these guaranteed permit fees?
No. The notes reproduce available reviewed guidance from the relevant municipal guide. Actual fees are set by the municipality and depend on the application.
Does the processing timeline include every approval?
Not necessarily. Zoning, variances, other applicable-law reviews, missing documents and inspections can follow different processes. Check the official source for your exact proposal.
Why don't some rows show a dollar amount?
Because BuildRules does not invent a number when a verified fixed fee is not available for that project. Follow the municipal source and ask the issuing authority for the current fee schedule.