Permit decision · Official evidence
What the municipality actually requires.
These are general rules and exceptions, not approval for your address. Review the conditions and open the original sources before starting work.
Markham lists raised decks more than 24 inches above existing grade as requiring a building permit.
Source · City of Markham
Building Permit Process · Permit triggers, exemptions, zoning and application requirements
Source checked Oct 1, 2026Open official sourceThe City lists decks less than 600 mm above existing grade at all locations among housing projects that do not need a permit.
Source · City of Markham
Building Permit Process · Permit triggers, exemptions, zoning and application requirements
Source checked Oct 1, 2026Open official sourceFor a hypothetical residential deck/accessory structure under 50 m² requiring minor setback relief without change of use, Markham confirmed Residential Small Scale Development Standards (Table 7 item 7.1.2). The City’s 2026 listed fee is $2,942, separate from any building permit or zoning preliminary review fee.
Source · City of Markham
Markham By-law 211-83, 2026 Schedule A amended March 24, 2026 · 2026 Table 7 minor variances: 7.1.1 $6,931 for qualifying additions/alterations/new dwellings 50 m² or greater (footnote 1); 7.1.2 $2,942 for qualifying small residential structures under 50 m² (footnote 2); 7.1.7 multiple-lot maximum $31,606 amended March 24, 2026. City Committee of Adjustment supervisor confirmed October 30 the earlier 60 m² example was not a separate threshold.
Source checked Oct 30, 2026Open official sourceNext step · Applications and documents
How to apply and what to prepare.
These are filing instructions and preparation checks. They do not prove a building permit is required or exempted for your property.
Markham directs applicants to confirm zoning and other applicable laws before preparing the permit application.
Source · City of Markham
Building Permit Process · Permit triggers, exemptions, zoning and application requirements
Source checked Oct 1, 2026Open official sourcePlan your shopping list
Estimate materials before the first quote.
Use your own measurements and supplier specifications. These tools do not determine structural design or permit requirements.
Take it with you
Prepare the project and compare written quotes.
Free working documents to fill in or print. Confirm the applicable requirements with the municipality.
Make a start
Your preparation checklist
Deck
Planning record, not municipal approval. Confirm the conditions and official requirements for your property.
0 of 4 ready
Your progress is saved in this browser. Project reference, date and notes stay in this tab until you leave.
Plan ahead
Fees and timing
Review timeline
Confirm the current municipal review stage after the application is accepted as complete.
Permit fees
If a residential deck/accessory structure under 50 m² needs a minor setback variance without change of use, Markham confirmed the Residential Small Scale Development Standards category (2026 Committee of Adjustment Table 7, 7.1.2; published fee $2,942).
Read all fee conditions
This application fee is separate from building-permit fees and from any Zoning Preliminary Review (ZPR) fee. A variance is NOT automatically required for a deck. Actual charges depend on the proposal and current fee schedule.
Different project, different permit question
Planning a shed instead of a deck?
A shed can have different permit and placement conditions. Use the published Markham shed guide rather than this deck guide to check its applicable rules and municipal sources.
Markham shed permit requirementsFrom reading to doing
Your next steps.
Follow the practical steps in the published Markham guide. Confirm unresolved details with the City before committing to work.
Measure the deck height above existing grade
Confirm whether it is attached to the dwelling
Check the applicable zoning by-law
Submit the complete application through ePLAN when required
Trace the evidence
Official sources behind this guide.
These are the source documents linked in the rules above. Check the municipal authority for current requirements before submitting a project.
- City of Markham
Building Permit Process · Permit triggers, exemptions, zoning and application requirements
Source checked Oct 1, 2026
- City of Markham
Markham By-law 211-83, 2026 Schedule A amended March 24, 2026 · 2026 Table 7 minor variances: 7.1.1 $6,931 for qualifying additions/alterations/new dwellings 50 m² or greater (footnote 1); 7.1.2 $2,942 for qualifying small residential structures under 50 m² (footnote 2); 7.1.7 multiple-lot maximum $31,606 amended March 24, 2026. City Committee of Adjustment supervisor confirmed October 30 the earlier 60 m² example was not a separate threshold.
Source checked Oct 30, 2026
A little more clarity
Common questions.
Do you need a permit for a deck in Markham?
Markham lists raised decks more than 600 mm above grade as permit-required and lists low decks under 600 mm as permit-exempt.
What should I prepare for this Deck project in Markham?
Start with: Completed application forms; Scaled construction drawings; Supporting zoning or applicable-law documentation where required; Applicable permit fee at submission. Confirm the final submission requirements with Markham for the actual project.
What should I do before starting this project in Markham?
Measure the deck height above existing grade. Confirm whether it is attached to the dwelling. Check the applicable zoning by-law. Submit the complete application through ePLAN when required.
Know the approval terms
The permit decision can involve more than one rule.
Use these plain-language definitions to understand the conditions above, then check the official source for your municipality.
Setback
A setback is the required distance between a building or structure and a property line, street, another feature or another regulated reference point.
Lot coverage
Lot coverage is a zoning measurement describing how much of a lot is occupied by buildings or structures under the applicable municipal rules.
Building permit
A municipal approval required before certain construction, alteration, demolition or change-of-use work can proceed. The permit review checks the proposed work against the Ontario Building Code, local zoning and other applicable law.
Same project, different city
See how this rule changes across Ontario.
Compare the source-reviewed answer for this project across every municipality BuildRules currently covers.
Compare deck rules by cityProfessional help
Find help with your deck in Markham.
Review the available options by city and project. Only a business with a claimed BuildRules profile can receive a direct referral, and responses are never guaranteed.
Get help with deck