Waterloo requires a permit for a shed over 15 square metres.
A shed or detached garage containing plumbing needs a building permit.
Waterloo states that smaller permit-exempt structures must still follow zoning rules.
Your preparation checklist
0 of 4 ready
Your progress is saved in this browser. Come back whenever you’re ready.
Fees and timing
Next steps
- Measure shed floor area
- Confirm whether plumbing is proposed
- Check zoning setbacks and placement
- Apply if the 15 m² or plumbing trigger applies