Ottawa Building Code Services confirmed in writing on October 28, 2026: creating a new additional dwelling unit (ADU) is submitted as an ADU under a construction permit, even if the construction work is plumbing-only. If little or no physical work is proposed and the intent is solely to establish an existing space as an ADU through a change of use, the City says a Change of Use permit may instead be appropriate. Ask the City to confirm the applicable route for your scope.
Depends on project conditions1 official source
Oct 28, 2026Finishing a basement in Ottawa may require a building permit when the project includes regulated alterations, structural work or other material changes. Define the exact work rather than assuming all cosmetic basement finishes need a permit.
Depends on project conditions1 official source
Nov 12, 2026In Ottawa, a deck adjacent or attached to a house with a walking surface more than 600 mm (24 in) above adjacent grade requires a building permit, regardless of size. A deck serving as a principal entrance also needs a permit. An independent raised deck over 10 m² also requires one.
Depends on project conditions1 official source
Nov 12, 2026Ottawa lists a possible permit exemption for some detached, one-storey garages under 15 m², but its general guidance also gives a 10 m² threshold for non-shed accessory buildings. Ask Ottawa Building Code Services to confirm the exemption for your specific garage before building.
Depends on project conditions2 official sources
Oct 1, 2026Yes. Ottawa identifies additions as building-permit work and gives examples including sunrooms, attached garages, porches and one- or two-storey additions.
Depends on project conditions1 official source
Oct 1, 2026Ottawa requires a building permit for plumbing system alterations, additions or extensions, while replacing existing fixtures without modifying the plumbing is listed as exempt.
Depends on project conditions2 official sources
Nov 12, 2026Ottawa lists installing or replacing asphalt shingles on an existing roof among projects that do not require a building permit, provided the work does not involve regulated structural changes.
Depends on project conditions1 official source
Nov 12, 2026A detached, one-storey storage shed of 15 m² or less may be exempt if it is storage-only, without plumbing, and meets Ottawa’s other conditions. Certain other small accessory structures can also qualify, but the City may review them individually. Zoning approval is a separate check.
Depends on project conditions1 official source
Oct 1, 2026Ottawa requires a building permit for a new window opening or for enlarging or relocating a window or door opening. Replacing windows or doors in existing same-size openings is generally exempt, subject to the exact scope and any heritage restrictions.
Depends on project conditions1 official source
Nov 12, 2026