Adding a dwelling unit or apartment requires a building permit. For an accessory apartment within an existing house, Oshawa confirmed the 2026 item 44 rate of $7.79 per m², with a minimum billable area of 50 m². Other project-specific charges may apply.
Depends on project conditions3 official sources
Oct 27, 2026Yes. Oshawa lists finishing a basement among projects that require a building permit.
Depends on project conditions2 official sources
Oct 1, 2026Oshawa requires a Building Code change-of-use permit when a new use increases the hazard classification, even if no construction is proposed. Use the portal's Change of Use category ONLY when no construction is planned; if construction is proposed, use Alteration/Renovation. The 2026 Building By-law Schedule B lists a $160 flat change-of-use fee without construction; projects with construction use the applicable permit class instead.
Depends on project conditions2 official sources
Nov 9, 2026Oshawa lists building a sundeck, deck or porch as requiring a building permit. A house deck 600 mm (24 in) high or less from the ground with no roof does not require a building permit. Zoning regulations still apply, including to permit-exempt projects.
Depends on project conditions1 official source
Oct 1, 2026Oshawa requires a demolition permit for removal of buildings and additions. Before submitting, obtain signed service disconnection notices and complete the Demolition Information Form and Environmental Waiver. A no-service accessory shed may not need the disconnection form. Demolition that changes lot grading can also require a Site Alteration permit.
Depends on project conditions1 official source
Nov 9, 2026Widening, relocating or re-routing a driveway in Oshawa is listed by the City as work that requires a Site Alteration permit. A curb cut, boulevard change or parking-layout modification can require separate municipal access and zoning checks. No building permit alone does not mean no approvals.
Depends on project conditions1 official source
Nov 9, 2026A new detached garage or carport in Oshawa normally needs a building permit. The City's small-structure exemption is published specifically for qualifying sheds, not as blanket permission to build any garage under 15 m². A separate Site Alteration permit may also be required for constructing new structures or changing grading.
Depends on project conditions2 official sources
Nov 9, 2026Oshawa lists replacement of a natural-gas, propane or oil furnace as exempt from a building permit only when the ductwork stays unchanged. Altering ducts, changing heating source, rooftop HVAC and other mechanical work requires confirmation of the Mechanical (HVAC) building-permit category. Separate gas/fuel and electrical trade approvals may apply.
Depends on project conditions1 official source
Nov 9, 2026Yes. Oshawa lists construction of any building or addition among projects requiring a building permit.
Depends on project conditions1 official source
Oct 1, 2026Oshawa requires building permits for basement finishing and regulated residential interior alterations. The 2026 Building By-law fee for House / Finishing Basement is $7.79 per m² of chargeable alteration area, with a minimum chargeable floor area of 50 m² and general $160 permit minimum. A separate Interior Gutting (house) permit is $160 flat. Painting or replacement of non-fire-rated ceiling/floor finishes alone can be exempt.
Depends on project conditions2 official sources
Nov 9, 2026Oshawa requires a permit for a new house. The 2026 Building By-law Schedule B Part B item 23 lists $15.56 per m² for Group C residential houses and accessory buildings for human habitation, with a $160 general minimum. The City's New Construction-Residential portal category is distinct from Production Builder certified-model applications. Development charges, grading, sewer/water connections and other approvals are separate.
Depends on project conditions2 official sources
Nov 9, 2026Oshawa requires building permits for new, moved or altered plumbing systems and routes 'plumbing only', sump pumps, backflow devices and site services through its Plumbing application category. Replacing a plumbing fixture is listed as exempt when no additional regulated work is involved. The 2026 bylaw lists $27 per house plumbing fixture, $82 per sump or backflow item and a $160 general minimum permit charge.
Depends on project conditions2 official sources
Nov 9, 2026Oshawa requires a pool enclosure permit for a pool or hot tub deeper than 60 cm. Water 30–60 cm deep still requires an enclosure at least 1.2 m high. A permitted enclosure must pass City inspection before the pool is filled.
Depends on project conditions2 official sources
Nov 9, 2026Oshawa lists replacement of roof shingles and non-structural roof repair on a house as not requiring a building permit. Structural roof changes, alterations to load-bearing framing, substantial roof repairs or changes to geometry can require a separate building permit. For regulated repair/replacement work, the 2026 Building By-law Schedule B item 64 lists $7.80 per m², subject to the $160 general minimum; that fee does NOT apply automatically to exempt shingle replacement.
Depends on project conditions2 official sources
Nov 9, 2026Oshawa requires a building permit for a shed larger than 15 m².
Depends on project conditions1 official source
Oct 1, 2026Oshawa routes solar panels through its Renewable Energy permit application category. For solar panels on houses, the City confirmed that Schedule B item 75 applies; the 2026 schedule lists $160 per 10 panels. Only one solar fee category applies and the minimum permit fee applies if the calculated amount is lower.
Depends on project conditions2 official sources
Nov 12, 2026Oshawa lists sump pumps under its Plumbing building-permit category. Its 2026 Schedule B item 98 charges $82 per sump/manhole/catchbasin/interceptor item, with a general minimum building permit application fee of $160. Sump work that also includes a new storm/sanitary service, site connection, drainage alteration or backflow device may require other permit categories and approvals.
Depends on project conditions2 official sources
Nov 9, 2026Oshawa exempts replacement of a same-size window or door in a house from the City building-permit requirement, provided work stays within the listed exemption. New or enlarged openings, changed load-bearing structural framing, fire-rated assemblies or other alterations require building permit review. The 2026 Building By-law lists a Window or Door Replacement permit fee of $9.65 per metre of opening width for permit-controlled work, subject to the $160 general minimum; this does not impose a permit on ordinary exempt same-size house replacements.
Depends on project conditions2 official sources
Nov 9, 2026