Oshawa project guide

What do you need for a basement secondary suite in Oshawa?

Oshawa basement apartment permit: Add a dwelling unit application, 2026 item 44 fee of $7.79/m² and 50 m² billing minimum. See requirements and examples.

4 min readMunicipal source reviewed Oct 27, 2026
Editorial illustration of a basement apartment / secondary suite project
Project illustration; not an assessed property or an approved design.
The short answerConditional

Adding a dwelling unit or apartment requires a building permit.

  • For an accessory apartment within an existing house, Oshawa confirmed the 2026 item 44 rate of $7.79 per m², with a minimum billable area of 50 m².
  • Other project-specific charges may apply.
Understand the conditions in detail

The guide is for basement secondary suites in existing buildings, not detached accessory-building units or third units. The City confirmed item 44 for an accessory apartment within an existing house on October 27, 2026. In the portal, select Add a dwelling unit, not Alteration or renovation.

Conditions and exceptions to check

  • Dwelling unit / apartment: Permit required
  • Project scope: Detached accessory units / third units use different requirements

Official source

Next step

Confirm this is a basement second unit in an existing building

Municipal guidance only. Your property's zoning and other applicable approvals may change the result.

BUILDRULES / OSHAWA

Share Oshawa guidance

Send the answer with its source and review date. No property address is included.

Oshawa / Basement apartment / secondary suite

Adding a dwelling unit or apartment requires a building permit. For an accessory apartment within an existing house, Oshawa confirmed the 2026 item 44 rate of $7.79 per m², with a minimum billable area of 50 m². Other project-specific charges may apply.

City of Oshawa · BuildRules reviewed 2026-10-27

Oshawa project paths

A basement apartment, or another kind of renovation?

Choose the actual work before you plan the permit application. Different scopes can need different drawings, professionals and approvals.

These are published Oshawa municipal guides, not a property assessment or approval. Confirm the proposed work and current requirements with official sources before starting.

Project navigator / OshawaCompare project paths before you commit.Find the guide for the work you actually plan, then compare it with this project.Open navigator
1What are you changing inside the basement?

Choose one scope to start. If your renovation includes several, review each applicable guide.

Only guides with current source records in the BuildRules catalogue are shown. Other scopes may still require municipal confirmation; absence from this list does not mean an exemption.

Permit decision · Official evidence

What the municipality actually requires.

These are general rules and exceptions, not approval for your address. Review the conditions and open the original sources before starting work.

Dwelling unit / apartmentPermit requiredConditional

Oshawa requires a building permit to add a dwelling unit or apartment. Select Add a dwelling unit in the portal. The City confirmed the 2026 item 44 basement-finishing fee of $7.79/m² for an accessory apartment in a house, with a minimum billable area of 50 m².

Source · City of Oshawa

Building Permits · Residential permit triggers and project resources

Source checked Nov 9, 2026Open official source
Project scopeDetached accessory units / third units use different requirementsConditional

The City guide states that its basement-secondary-suite content does not apply to an accessory-building dwelling unit or addition of a third unit.

Source · City of Oshawa

Ontario Building Code Guide to Basement Secondary Suite · Basement secondary-suite Building Code guidance

Source checked Oct 1, 2026Open official source

Next step · Applications and documents

How to apply and what to prepare.

These are filing instructions and preparation checks. They do not prove a building permit is required or exempted for your property.

Basement secondary suiteDedicated 2024 OBC guidance

Oshawa publishes a current guide for basement secondary suites in existing buildings.

Source · City of Oshawa

Ontario Building Code Guide to Basement Secondary Suite · Basement secondary-suite Building Code guidance

Source checked Oct 1, 2026Open official source
Building permit feeItem 44: $7.79/m²; 50 m² minimum billable area

Confirmed in writing by Oshawa Permit Administration Services on October 27, 2026 for an accessory apartment within an existing house. 80 m² costs $623.20 for this fee component; 30 m² is billed at 50 m² ($389.50). Additional charges and exact scope require separate confirmation.

Source · City of Oshawa

Building By-law 33-2009 as amended 118-2025: 2026 Schedule B · 2026 effective January 1 rates, minimum $160, Schedule C application documents

Source checked Nov 9, 2026Open official source

Take it with you

Prepare the project and compare written quotes.

Free working documents to fill in or print. Confirm the applicable requirements with the municipality.

Make a start

Your preparation checklist

buildrules.caPROJECT PREPARATION

Basement apartment / secondary suite

Planning record, not municipal approval. Confirm the conditions and official requirements for your property.

Your preparation progress

0 of 5 ready

Your progress is saved in this browser. Project reference, date and notes stay in this tab until you leave.

Guide : buildrules.ca/oshawa/secondary-suite-permit · Sources reviewed 2026-10-27

Open the focused permit checklist

Plan ahead

Fees and timing

Review timeline

Confirm the current municipal review timeline after the application is accepted as complete.

Permit fees

Oshawa Permit Administration Services confirmed on October 27, 2026 that an accessory apartment within an existing house uses Schedule B item 44, House / Finishing Basement, at $7.79 per m².

Read all fee conditions

Chargeable area is the greater of the actual altered area and 50 m². Example: 80 m² = $623.20; a 30 m² conversion is charged on 50 m² = $389.50. The general $160 minimum is not an extra fee. This is the building-permit component only; the City reviews each scope individually and other approvals or separate work may affect the total.

From reading to doing

Your next steps.

Follow the practical steps in the published Oshawa guide. Confirm unresolved details with the City before committing to work.

  1. Confirm this is a basement second unit in an existing building

  2. Review the City’s 2024 OBC guide and prepare complete permit drawings

  3. Select Add a dwelling unit in the application portal

  4. Confirm the item 44 fee and any other applicable charges; submit before construction

Trace the evidence

Official sources behind this guide.

These are the source documents linked in the rules above. Check the municipal authority for current requirements before submitting a project.

  • City of Oshawa

    Building Permits · Residential permit triggers and project resources

    Source checked Nov 9, 2026

  • City of Oshawa

    Ontario Building Code Guide to Basement Secondary Suite · Basement secondary-suite Building Code guidance

    Source checked Oct 1, 2026

  • City of Oshawa

    Building By-law 33-2009 as amended 118-2025: 2026 Schedule B · 2026 effective January 1 rates, minimum $160, Schedule C application documents

    Source checked Nov 9, 2026

A little more clarity

Common questions.

What do you need for a basement secondary suite in Oshawa?

Adding a dwelling unit or apartment requires a building permit, and Oshawa publishes a dedicated 2024 Building Code guide for basement secondary suites.

What should I prepare for this Basement apartment / secondary suite project in Oshawa?

Start with: Building permit application; Existing and proposed floor plans; Life-safety and separation details; Plumbing/mechanical information; Project-specific designer information. Confirm the final submission requirements with Oshawa for the actual project.

What should I do before starting this project in Oshawa?

Confirm this is a basement second unit in an existing building. Review the City’s 2024 OBC guide. Prepare the complete permit drawings. Submit before construction.

How much is a building permit for an 80 m² basement apartment in Oshawa?

The City confirmed item 44 at $7.79 per m², with a minimum billable area of 50 m². An 80 m² interior conversion has a $623.20 building-permit component, subject to individual scope review and other applicable charges.

Know the approval terms

A second unit can meet one rule and still need another approval.

Building permits, zoning and applicable law are separate parts of the approval path.

Same project, different city

See how this rule changes across Ontario.

Compare the source-reviewed answer for this project across every municipality BuildRules currently covers.

Compare basement apartment / secondary suite rules by city

Professional help

Find help with your basement apartment / secondary suite in Oshawa.

Review the available options by city and project. Only a business with a claimed BuildRules profile can receive a direct referral, and responses are never guaranteed.

Get help with basement apartment / secondary suite

When you need a hand

Choose your next step.

Keep preparing on your own, get a research brief, or ask for professional help.

BuildRules / Preparation briefFree report

Before your first contractor quote

Bring the right questions to the conversation.

Collect the published local guidance, documents to prepare and unresolved property questions in one brief you can send or print.

01 Permit and local-rule guidance02 Documents to prepare03 Questions still to verify
Prepare my free project brief

Read and print the brief on screen. Email a copy optionally. Newsletter optional. This is guidance, not municipal approval.

Professional help

Bring the right people into your project.

Need drawings, engineering or a quote? Tell us what you need and we’ll save your request with the project context.

Request project help

A little help with the next step

Move your basement apartment / secondary suite forward.

Tell us what kind of help you need. BuildRules saves your project request for review. This form does not send your details directly to a listed professional.

Your request goes to BuildRules, not directly to a contractor. Municipal approval stays with the City.

A provider match is not guaranteed. Municipal approval stays with the City.