Ontario Permit Cost Atlas / Source-reviewed guidance

Before you budget the permit,
check the city.

There is no single Ontario building permit price or approval date. Compare the published project guidance for each municipality, then open the original source before filing.

30project categories
62municipalities covered
2026-11-12latest guide review

Compare project costs and timing

Start with the work you're planning.

Every note is drawn from a published BuildRules project guide. A blank dollar figure means no reliable fixed amount is provided in that guide—not that the permit is free.

Compare how two cities describe the same project

Two cities. Two municipal source trails.

Look at the published fee basis and timeline side by side. Different application classifications or extra reviews can make the numbers non-comparable. These are not quotes.

What the published guidance can actually tell you

38municipal project guides
8guides with a dollar-denominated fee note
1guides stating a specific review duration without a general qualification

A dollar amount is evidence from the reviewed guide, not a guaranteed final fee. Check the project classification and updated municipal schedule. Published review durations describe specific streams or conditions, not a promise of overall project completion. Additional charges, zoning reviews, other approvals and incomplete applications can change the actual total.

Shed / accessory structure

38 municipal guides with source-reviewed notes. Guides with published dollar amounts appear first; those figures still need current confirmation.

Download source-linked CSV
MunicipalityFee guidanceProcessing and timingEvidence
BramptonShed / accessory structureAmount published in reviewed guide
Brampton's 2026 Building By-law schedule (revised February 2026) lists a $326.21 flat fee for a residential stand-alone… Read complete fee guidance

Brampton's 2026 Building By-law schedule (revised February 2026) lists a $326.21 flat fee for a residential stand-alone 'Accessory Structure, Shed' building permit. The February 2026 Accessory Buildings Package also quotes $326.21. Apply only where the proposed structure REQUIRES a building permit; qualifying permit-exempt storage sheds do not have an automatic building-permit fee. Lot coverage, setbacks, property survey, drawings, and other zoning/approval conditions remain separate. Sources: City of Brampton Building By-law 387-2006 and Accessory Buildings Package (reviewed Oct. 20, 2026).

Brampton's February 2026 Accessory Buildings Package lists a Standard 10 Day Permit Application Service for an accessory structure requiring a permit, after a complete application. Do not treat this as a guaranteed issuance date; zoning and other approvals may add time.

CaledonShed / accessory structureAmount published in reviewed guide
Caledon's January 1, 2026 Schedule B lists a $6.72/m² service index for detached residential garages, sheds and accessory… Read complete fee guidance

Caledon's January 1, 2026 Schedule B lists a $6.72/m² service index for detached residential garages, sheds and accessory buildings, with a general building-permit minimum of $193. For a shed that actually requires a permit, the minimum may control the payable amount; at 15 m², the indexed amount would be $100.80 before applying the general minimum. This fee does not include possible zoning, conservation or other project costs. Confirm the exact classification and amount with Building Services.

Where permit-exempt, the Town's separate zoning clearance is still required before construction. For a shed requiring a building permit, Caledon does not promise a specific decision timeline on its permit overview; submit complete plans online and follow any review requests.

CambridgeShed / accessory structureAmount published in reviewed guide
City-issued 2026 simplified fee schedule, p.7: if a residential accessory shed actually requires a permit, its building… Read complete fee guidance

City-issued 2026 simplified fee schedule, p.7: if a residential accessory shed actually requires a permit, its building permit rate is $0.46/ft² of chargeable area (minimum $143), with $25 separate accessory-structure zoning review. Qualifying detached storage-only sheds no more than 15 m² with no plumbing may be exempt from a building permit; a fee is not charged for an exempt project. Verify zoning and siting.

No Cambridge project-specific review period has been verified here. Ask when the completeness review begins and which outside approvals must be obtained first.

ClaringtonShed / accessory structureAmount published in reviewed guide
An exempt qualifying storage shed does not need a building permit fee. Where a building permit is required, Clarington’s… Read complete fee guidance

An exempt qualifying storage shed does not need a building permit fee. Where a building permit is required, Clarington’s Accessory Structures webpage lists a building permit cost of $5.54 per m² with a $127.54 minimum; confirm the current applicable category and charges before applying. Zoning, site alteration and other approvals or fees, if any, were not confirmed by the October 30 municipal email.

Confirm the current municipal review timeline after a complete application is accepted.

MarkhamShed / accessory structureAmount published in reviewed guide
No minor-variance fee is triggered simply by installing a shed. But where a deck or accessory building under 50 m² needs a… Read complete fee guidance

No minor-variance fee is triggered simply by installing a shed. But where a deck or accessory building under 50 m² needs a minor setback variance without change of use, Markham confirmed Residential Small Scale Development Standards (2026 Table 7, 7.1.2; published fee $2,942). Zoning Preliminary Review (ZPR), if requested, is billed separately; any building-permit charges are also separate.

Confirm the current municipal review stage after the application is accepted as complete.

PickeringShed / accessory structureAmount published in reviewed guide
For a shed that does require a permit, Pickering's official July 1, 2026 City Development schedule lists $180 EACH for… Read complete fee guidance

For a shed that does require a permit, Pickering's official July 1, 2026 City Development schedule lists $180 EACH for 'Minor Residential Structures and Alterations', including storage sheds and garages; the 2026 minimum building-permit fee is also $180. Permit-exempt sheds do not automatically owe that building-permit fee. Confirm any zoning, drawing, surcharge or other charges separately.

If the shed qualifies for an exemption, there is no building-permit processing period, though zoning still applies. If a permit is required, Pickering does not guarantee a fixed review time on its published building-permit page; request the current review estimate from Building Services.

TorontoShed / accessory structureAmount published in reviewed guide
Toronto's Building Permit Fees effective Jan. 1, 2026 list $214.79 EACH for the 'Single Family Detached Garages, Accessory… Read complete fee guidance

Toronto's Building Permit Fees effective Jan. 1, 2026 list $214.79 EACH for the 'Single Family Detached Garages, Accessory Structures' stand-alone permit category. This is a building-permit fee ONLY when the proposed shed/accessory building actually needs a permit; a permit-exempt shed does not automatically incur this building-permit fee. Zoning, tree protection, drawings, grading or other approvals may require separate review and charges. Confirm the permit classification with the City. Source: City of Toronto, Building Permit Fees, section E (reviewed Oct. 20, 2026).

If a permit is needed and the shed qualifies for Toronto Express Services, a complete application is assigned examiner review within 3 days; permit issuance after approval and fee payment is typically within one business day. Deficiencies and zoning/heritage approvals can extend the process. At 15 m² exactly, confirm exemption status with Toronto Building before buying.

VaughanShed / accessory structureAmount published in reviewed guide
Vaughan By-law 051-2026, Schedule F, lists a $195.00 flat 2026 fee per Part 9 accessory building without plumbing (garden… Read complete fee guidance

Vaughan By-law 051-2026, Schedule F, lists a $195.00 flat 2026 fee per Part 9 accessory building without plumbing (garden shed, gazebo, cabana) under 20 m², and $590.00 flat for a garden shed/gazebo 20 m² or greater. A cabana with plumbing may fall under a different per-m² fee. IMPORTANT: these are building-permit fees ONLY IF a permit is required; the size thresholds in the fee schedule do not replace the distinct permit-exemption and zoning tests (which may be stricter). Grading permission, returnable security and other reviews may add costs. Source: City of Vaughan, 2026 Fees and Charges By-law 051-2026, Schedule F (reviewed Oct. 20, 2026).

Confirm the current municipal review stage after the application is accepted as complete.

AjaxShed / accessory structure

Confirm the applicable Ajax building permit fee from the municipality's current fee schedule.

Check Ajax's current review timeline once a complete application is submitted.

AuroraShed / accessory structure

Confirm the current Aurora fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

Brock TownshipShed / accessory structure

Confirm the current Brock fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

BurlingtonShed / accessory structure

Confirm the current Burlington building permit fee schedule before filing.

Confirm the current municipal review stage after the application is accepted as complete.

East GarafraxaShed / accessory structure

If a permit is required, Dufferin County requests payment through CityView after approval. Confirm the current amount with Building Services.

Confirm the current municipal service standard.

East GwillimburyShed / accessory structure

Confirm the current East Gwillimbury fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

GeorginaShed / accessory structure

Confirm the current Georgina fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

Grand ValleyShed / accessory structure

If a permit is required, Dufferin County requests payment through CityView after approval. Confirm the current amount with Building Services.

Confirm the current municipal service standard.

Greater SudburyShed / accessory structure

Greater Sudbury adjusts its fees annually. Ask Building Services to confirm the current fee for your application.

Confirm the current municipal service standard.

GuelphShed / accessory structure

Check the current Guelph building permit fee schedule linked below.

Confirm the current municipal service standard.

Halton HillsShed / accessory structure

Confirm the current Halton Hills fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

HamiltonShed / accessory structure

Confirm the current Hamilton building permit fee schedule before filing.

Confirm the current municipal review stage after the application is accepted as complete.

King TownshipShed / accessory structure

Confirm the current King Township fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

KitchenerShed / accessory structure

Confirm the current Kitchener permit fee for the exact project class before filing.

Confirm the current municipal review timeline after the application is accepted as complete.

LondonShed / accessory structure

Confirm the current London permit fee for the exact project class before filing.

London lists a 10-business-day statutory review timeline for sheds servicing houses once the application is complete.

MelancthonShed / accessory structure

If a permit is required, Dufferin County requests payment through CityView after approval. Confirm the current amount with Building Services.

Confirm the current municipal service standard.

MississaugaShed / accessory structure

Confirm the current Mississauga permit fee schedule if the proposed accessory structure requires a permit.

The applicable review path depends on whether the structure needs a permit and the completeness of the submission.

MonoShed / accessory structure

If a permit is required, Dufferin County requests payment through CityView after approval. Confirm the current amount with Building Services.

Confirm the current municipal service standard.

MulmurShed / accessory structure

If a permit is required, Dufferin County requests payment through CityView after approval. Confirm the current amount with Building Services.

Confirm the current municipal service standard.

NewmarketShed / accessory structure

Confirm the current Newmarket fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

OakvilleShed / accessory structure

Confirm the current Oakville building permit fee schedule before filing.

Confirm the current municipal review stage after the application is accepted as complete.

OshawaShed / accessory structure

Confirm the current Oshawa permit fee for the exact project class before filing.

Confirm the current municipal review timeline after the application is accepted as complete.

OttawaShed / accessory structure

Use Ottawa’s current applicable-fee schedule. The City page does not present one universal flat shed permit amount.

A previously published Ottawa service guide suggested approximately five business days for an eligible complete small accessory-building application. This current review did not verify the service standard or issuance date; confirm the current review timeline with Ottawa Building Code Services.

Richmond HillShed / accessory structure

Confirm the applicable Richmond Hill building permit fee from the municipality's current fee schedule.

Check Richmond Hill's current review timeline once a complete application is submitted.

ScugogShed / accessory structure

Confirm the current Scugog fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

ShelburneShed / accessory structure

If a permit is required, Dufferin County requests payment through CityView after approval. Confirm the current amount with Building Services.

Confirm the current municipal service standard.

StouffvilleShed / accessory structure

Confirm the current Stouffville fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

UxbridgeShed / accessory structure

Confirm the current Uxbridge fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

WaterlooShed / accessory structure

Confirm the current Waterloo permit fee for the exact project class before filing.

Waterloo lists a 10-business-day processing timeline for sheds serving houses once an application is complete.

WhitbyShed / accessory structure

Confirm the current Whitby permit fee for the exact project class before filing.

Confirm the current municipal review timeline after the application is accepted as complete.

Important: municipal permit fees may depend on the precise scope, construction value, area, additional charges and current fee schedule. A target review period is not an approval promise; incomplete applications, zoning and applicable-law reviews can change the timing. This index does not replace an official municipal quotation or decision.

Now make it property-specific

The same project can have different constraints at two addresses.

Use the property check to see the municipal route and available zoning context, then review the official instructions for the proposed work.

Try a source-linked deck or shed permit pre-check →

Check an Ontario address

Understand what the index is showing.

Are these guaranteed permit fees?

No. The notes reproduce available reviewed guidance from the relevant municipal guide. Actual fees are set by the municipality and depend on the application.

Does the processing timeline include every approval?

Not necessarily. Zoning, variances, other applicable-law reviews, missing documents and inspections can follow different processes. Check the official source for your exact proposal.

Why don't some rows show a dollar amount?

Because BuildRules does not invent a number when a verified fixed fee is not available for that project. Follow the municipal source and ask the issuing authority for the current fee schedule.