Scope before arithmetic
Make sure the fee belongs to your project.
Ottawa uses three distinct permit triggers: a deck attached or adjacent to a house with surface over 600 mm; any elevated deck serving as principal building access; and an independent deck whose walking surface exceeds 10 m² and 600 mm above grade. A low deck may be exempt, but zoning setbacks and access conditions still apply. Prepare measured site, foundation and framing plans if applying.
Ottawa states that an attached or adjacent deck with a walking surface more than 600 mm (24 in.) above adjacent grade requires a permit regardless of walking-surface area.
An elevated deck providing principal access to a building requires a permit regardless of walking-surface area.
For an independent deck, Ottawa identifies a permit trigger when the walking surface is more than 600 mm above grade and the area is greater than 10 m².
Official sources behind this page
Ottawa states that an attached or adjacent deck with a walking surface more than 600 mm (24 in.) above adjacent grade requires a permit regardless of walking-surface area.
An elevated deck providing principal access to a building requires a permit regardless of walking-surface area.
For an independent deck, Ottawa identifies a permit trigger when the walking surface is more than 600 mm above grade and the area is greater than 10 m².