What the municipality actually requires.
These are general rules and exceptions, not approval for your address. Review the conditions and open the original sources before starting work.
Mississauga lists basement apartments among permit-required projects and publishes an ARU conversion submission checklist.
Source · City of Mississauga
When a building permit is required · Permit-required and permit-exempt project examples
Source checked Oct 26, 2026Open official sourceMississauga states that second units must meet code and zoning requirements and be registered with the City.
Source · City of Mississauga
Registering a second unit · Free registration of a second unit; proof of ownership, signed-off permit and registration form
Source checked Oct 14, 2026Open official sourceThe City says eligible building permit fees are automatically refunded after an ARU is constructed or legalized and all required inspections are complete. Expect other design, construction and property-specific charges.
Source · City of Mississauga
Additional residential units: permit fee rebate and 2026 requirements · Building permit fee rebate, permit fees and charges, refund after all inspections, review time, zoning limitations
Source checked Oct 14, 2026Open official sourceNext step · Applications and documents
How to apply and what to prepare.
These are filing instructions and preparation checks. They do not prove a building permit is required or exempted for your property.
The City requires project-specific forms and drawings when converting existing space into a second, third or fourth unit.
Source · City of Mississauga
Additional residential unit conversions · Second, third and fourth unit conversion documents
Source checked Oct 1, 2026Open official sourceSchedule B (2026) lists $11.33 per m² for an additional residential unit within an existing building plus the minimum residential fee; the Part 9 residential minimum is $244. Final amount depends on the permit scope and area confirmed by the City.
Source · City of Mississauga
2026 Classes of Permits and Fees, Building By-law 0236-2024 Schedule B · Schedule B (PDF p. 1): Part 9 residential $244 minimum and Group C additional residential unit within an existing building $11.33/m² plus minimum residential fee
Source checked Oct 14, 2026Open official sourceThe City charges no fee to register a second unit, but requires proof of ownership, signed-off building-permit evidence and a completed registration form.
Source · City of Mississauga
Registering a second unit · Free registration of a second unit; proof of ownership, signed-off permit and registration form
Source checked Oct 14, 2026Open official sourceTake it with you
Prepare the project and compare written quotes.
Free working documents to fill in or print. Confirm the applicable requirements with the municipality.
Make a start
Your preparation checklist
Basement apartment / secondary suite
Planning record, not municipal approval. Confirm the conditions and official requirements for your property.
0 of 5 ready
Your progress is saved in this browser. Project reference, date and notes stay in this tab until you leave.
Plan ahead
Fees and timing
Review timeline
For a complete application, Mississauga indicates that the first permit review may take 15 business days.
Read all timing details
Incomplete submissions and re-submissions can add two weeks or more; this is not a guaranteed permit-issuance timeline.
Permit fees
Mississauga Building By-law 0236-2024 Schedule B (2026) lists an $11.33/m² rate for an additional residential unit inside an existing building, plus the minimum residential fee ($244 for Part 9 projects).
Read all fee conditions
The City calculates the final upfront building-permit charge after reviewing the type and size of the proposed unit. Critically, Mississauga says eligible permits for building or legalizing an ARU are automatically refunded after construction and all required inspections are complete. Registration of a second unit is free. Other costs can remain, including drawings, renovations, fire inspections, some development charges for additions or garden suites, and a $81.90 + HST address fee for garden suites where applicable. Confirm rebate eligibility and all charges for your property with the City.
From reading to doing
Your next steps.
Follow the practical steps in the published Mississauga guide. Confirm unresolved details with the City before committing to work.
Confirm the property and unit configuration
Prepare conversion drawings
Apply for the building permit
Complete inspections and registration requirements
Trace the evidence
Official sources behind this guide.
These are the source documents linked in the rules above. Check the municipal authority for current requirements before submitting a project.
- City of Mississauga
When a building permit is required · Permit-required and permit-exempt project examples
Source checked Oct 26, 2026
- City of Mississauga
Additional residential unit conversions · Second, third and fourth unit conversion documents
Source checked Oct 1, 2026
- City of Mississauga
Registering a second unit · Free registration of a second unit; proof of ownership, signed-off permit and registration form
Source checked Oct 14, 2026
- City of Mississauga
2026 Classes of Permits and Fees, Building By-law 0236-2024 Schedule B · Schedule B (PDF p. 1): Part 9 residential $244 minimum and Group C additional residential unit within an existing building $11.33/m² plus minimum residential fee
Source checked Oct 14, 2026
- City of Mississauga
Additional residential units: permit fee rebate and 2026 requirements · Building permit fee rebate, permit fees and charges, refund after all inspections, review time, zoning limitations
Source checked Oct 14, 2026
A little more clarity
Common questions.
Does a basement apartment need a permit in Mississauga?
Mississauga lists basement apartments among permit-required projects and publishes a dedicated additional-residential-unit conversion checklist.
Is a basement finish the same as an ARU in Mississauga?
No. Creating another dwelling unit uses the ARU conversion route, while ordinary basement finishing follows a separate permit path.
Does a second unit need to be registered in Mississauga?
Yes. Mississauga states that second units must meet applicable code and zoning requirements and be registered with the City.
What does a Mississauga additional residential unit building permit cost in 2026?
The 2026 Schedule B lists $11.33/m² for an additional residential unit within an existing building, plus the minimum residential fee ($244 for residential Part 9 work). The City calculates the exact upfront amount after assessing the proposed project. Qualifying ARU building-permit fees are refunded after construction and all required inspections are completed.
Are Mississauga ARU building permit fees refunded?
Mississauga says a building permit fee for building or legalizing an additional residential unit is automatically refunded after the ARU is built and all required building inspections are completed. The City mails a refund cheque. Other charges such as drawings, construction, applicable development charges and some service fees are separate.
Is there a fee to register a second unit in Mississauga?
No. Mississauga says registration of a second unit is free. Owners must provide proof of ownership, a signed-off building permit or obtain a permit if missing, and the registration form.
How long does Mississauga take to first-review an ARU permit?
The City says the first review of a complete ARU permit application may take 15 business days. Re-submissions can add two weeks or more; this is not an approval-time guarantee.
Know the approval terms
A second unit can meet one rule and still need another approval.
Building permits, zoning and applicable law are separate parts of the approval path.
Building permit
A municipal approval required before certain construction, alteration, demolition or change-of-use work can proceed. The permit review checks the proposed work against the Ontario Building Code, local zoning and other applicable law.
Zoning by-law
A municipal rule set that controls how land and buildings may be used and developed, including matters such as permitted uses, setbacks, height, lot coverage and other site-specific standards.
Applicable law
Requirements outside the Ontario Building Code that must be satisfied before a building permit can be issued when the Building Code identifies them as applicable law.
Same project, different city
See how this rule changes across Ontario.
Compare the source-reviewed answer for this project across every municipality BuildRules currently covers.
Compare basement apartment / secondary suite rules by cityProfessional help
Find help with your basement apartment / secondary suite in Mississauga.
Review the available options by city and project. Only a business with a claimed BuildRules profile can receive a direct referral, and responses are never guaranteed.
Get help with basement apartment / secondary suite