Scope before arithmetic
Make sure the fee belongs to your project.
Check whether new or enlarged opening affects a load-bearing wall, foundation, fire-rated separation, basement egress, heritage facade or zoning. The Town requires applications, designer Schedule 1, architectural drawings and Applicable Law checklist where applicable. For ordinary Part 9 Residential Alterations the E-Portal or paper application route is listed. An alteration requiring structural support may need a qualified engineer or designer; no fixed fee per window is published.
Check whether new or enlarged opening affects a load-bearing wall, foundation, fire-rated separation, basement egress, heritage facade or zoning. The Town requires applications, designer Schedule 1, architectural drawings and Applicable Law checklist where applicable. For ordinary Part 9 Residential Alterations the E-Portal or paper application route is listed. An alteration requiring structural support may need a qualified engineer or designer; no fixed fee per window is published.
Measure current and proposed opening, and classify same-size replacement versus new opening. Check structural/load-bearing and fire-rating changes; do not assume same-size replacement is exempt in Whitby. Prepare proposed opening framing, foundation or egress details as applicable. Submit regulated residential alteration through E-Portal or paper with designer forms. Ask Town to assess permit fee and provide inspection stages before closing walls.
Existing and proposed window/door dimensions and building location; Whether structure, headers, fire rating or foundation changes; Window well and emergency-egress details if applicable; Architectural/structural drawings and Schedule 1 if needed; Heritage, zoning and conservation approvals where relevant
Official sources behind this page
Check whether new or enlarged opening affects a load-bearing wall, foundation, fire-rated separation, basement egress, heritage facade or zoning. The Town requires applications, designer Schedule 1, architectural drawings and Applicable Law checklist where applicable. For ordinary Part 9 Residential Alterations the E-Portal or paper application route is listed. An alteration requiring structural support may need a qualified engineer or designer; no fixed fee per window is published.
Measure current and proposed opening, and classify same-size replacement versus new opening. Check structural/load-bearing and fire-rating changes; do not assume same-size replacement is exempt in Whitby. Prepare proposed opening framing, foundation or egress details as applicable. Submit regulated residential alteration through E-Portal or paper with designer forms. Ask Town to assess permit fee and provide inspection stages before closing walls.
Existing and proposed window/door dimensions and building location; Whether structure, headers, fire rating or foundation changes; Window well and emergency-egress details if applicable; Architectural/structural drawings and Schedule 1 if needed; Heritage, zoning and conservation approvals where relevant
Whitby expressly lists structural alterations including new windows/doors, but its general list does not resolve every same-opening replacement; obtain a Town classification.
Need the full project answer?
The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.
Open the windows / doors guide