Scope before arithmetic
Make sure the fee belongs to your project.
A wall may support loads even if it looks like an ordinary partition. Before demolition, identify existing joist directions, beams, posts and the proposed opening. Design of new lintels, beams and foundations depends on structural conditions. Whitby requires application, Schedule 1 designer information, architectural/structural drawings and Applicable Law checklist when applicable. Submit Residential Alterations / Additions (Part 9) using E-Portal or paper, not the demolition email stream.
A wall may support loads even if it looks like an ordinary partition. Before demolition, identify existing joist directions, beams, posts and the proposed opening. Design of new lintels, beams and foundations depends on structural conditions. Whitby requires application, Schedule 1 designer information, architectural/structural drawings and Applicable Law checklist when applicable. Submit Residential Alterations / Additions (Part 9) using E-Portal or paper, not the demolition email stream.
Establish whether wall is load-bearing and its relation to exits/fire separation. Measure beams, joists and support layout on levels above and below. Prepare structural design of any new opening/load path. Submit Residential Alterations through E-Portal or paper with forms and drawings. Confirm per-area alteration fee and $305 minimum; wait for permit and structural inspections before removing supports.
Plan showing wall being removed and rooms before/after; Joist spans and loads above/below wall; Proposed beam, posts and connection/foundation load path; Structural design and designer qualifications where required; Building Permit Application, Schedule 1 and Applicable Law checklist
Official sources behind this page
A wall may support loads even if it looks like an ordinary partition. Before demolition, identify existing joist directions, beams, posts and the proposed opening. Design of new lintels, beams and foundations depends on structural conditions. Whitby requires application, Schedule 1 designer information, architectural/structural drawings and Applicable Law checklist when applicable. Submit Residential Alterations / Additions (Part 9) using E-Portal or paper, not the demolition email stream.
Establish whether wall is load-bearing and its relation to exits/fire separation. Measure beams, joists and support layout on levels above and below. Prepare structural design of any new opening/load path. Submit Residential Alterations through E-Portal or paper with forms and drawings. Confirm per-area alteration fee and $305 minimum; wait for permit and structural inspections before removing supports.
Plan showing wall being removed and rooms before/after; Joist spans and loads above/below wall; Proposed beam, posts and connection/foundation load path; Structural design and designer qualifications where required; Building Permit Application, Schedule 1 and Applicable Law checklist
Whitby lists wall additions/removals as building permit projects; engineer/designer details, floor/beam support and mandatory inspection follow the actual load path.