Scope before arithmetic
Make sure the fee belongs to your project.
Determine whether work adds, relocates or alters plumbing or simply replaces a fixture; Whitby's general permit page does not establish an unconditional exemption for same-location replacements. Separate sewer/water service connections or basement alteration permits can change classification. The Town requires application, Schedule 1 designer form, plans and Applicable Law checklist when applicable, with E-Portal/paper for residential alterations and regulated plumbing.
Determine whether work adds, relocates or alters plumbing or simply replaces a fixture; Whitby's general permit page does not establish an unconditional exemption for same-location replacements. Separate sewer/water service connections or basement alteration permits can change classification. The Town requires application, Schedule 1 designer form, plans and Applicable Law checklist when applicable, with E-Portal/paper for residential alterations and regulated plumbing.
Determine actual work type: fixture, drain, water main, sump or backflow. Ask Whitby whether same-location replacement, standalone permit or residential alteration category applies. Prepare diagrams and scope, including pipe lengths and devices. Budget fee item(s) and $305 minimum, then confirm Town invoice. Submit correct application and book inspections before walls or trenches are closed.
List fixtures added, removed, replaced or relocated; Existing and proposed supply, drain and vent pipe runs; Length in metres of altered drains/water mains; Number of sump/interceptor or backflow devices; Whether work is within larger renovation or municipal connection
Official sources behind this page
Determine whether work adds, relocates or alters plumbing or simply replaces a fixture; Whitby's general permit page does not establish an unconditional exemption for same-location replacements. Separate sewer/water service connections or basement alteration permits can change classification. The Town requires application, Schedule 1 designer form, plans and Applicable Law checklist when applicable, with E-Portal/paper for residential alterations and regulated plumbing.
Determine actual work type: fixture, drain, water main, sump or backflow. Ask Whitby whether same-location replacement, standalone permit or residential alteration category applies. Prepare diagrams and scope, including pipe lengths and devices. Budget fee item(s) and $305 minimum, then confirm Town invoice. Submit correct application and book inspections before walls or trenches are closed.
List fixtures added, removed, replaced or relocated; Existing and proposed supply, drain and vent pipe runs; Length in metres of altered drains/water mains; Number of sump/interceptor or backflow devices; Whether work is within larger renovation or municipal connection
Whitby Schedule N lists fixture/drain/sump/backflow rates but separately provides a BGP-55 $305 minimum permit fee, so the Town must calculate the total.
Need the full project answer?
The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.
Open the plumbing / drain work guide