Scope before arithmetic
Make sure the fee belongs to your project.
Before building, check the property zone, accessory structure setbacks, height, lot coverage, driveway access and grading. Whitby requires a Building Permit Application, Schedule 1 designer information, architectural/structural drawings and Applicable Law checklist, with owner authorization, grading and engineer documentation when applicable. E-Portal submissions are pre-screened before the Town issues a fee invoice. An accepted pre-screen does not itself authorize construction.
Before building, check the property zone, accessory structure setbacks, height, lot coverage, driveway access and grading. Whitby requires a Building Permit Application, Schedule 1 designer information, architectural/structural drawings and Applicable Law checklist, with owner authorization, grading and engineer documentation when applicable. E-Portal submissions are pre-screened before the Town issues a fee invoice. An accepted pre-screen does not itself authorize construction.
Check whether the project is a new detached/attached garage or carport. Verify lot coverage, setbacks, height and driveway/servicing at the address. Prepare site plan, foundation, roof/framing and architectural drawings. Apply in Whitby E-Portal Garage / Accessory Structure category or on paper and complete pre-screen. Budget $10.65/m² with $305 minimum and wait for the issued permit and inspections.
Scaled site plan showing garage, existing buildings, setbacks and driveway; Footprint in m², height, roof and structural/foundation details; Application to Construct or Demolish and Schedule 1 designer information; Applicable Law checklist and any grading plan; Owner authorization where required
Official sources behind this page
Before building, check the property zone, accessory structure setbacks, height, lot coverage, driveway access and grading. Whitby requires a Building Permit Application, Schedule 1 designer information, architectural/structural drawings and Applicable Law checklist, with owner authorization, grading and engineer documentation when applicable. E-Portal submissions are pre-screened before the Town issues a fee invoice. An accepted pre-screen does not itself authorize construction.
Check whether the project is a new detached/attached garage or carport. Verify lot coverage, setbacks, height and driveway/servicing at the address. Prepare site plan, foundation, roof/framing and architectural drawings. Apply in Whitby E-Portal Garage / Accessory Structure category or on paper and complete pre-screen. Budget $10.65/m² with $305 minimum and wait for the issued permit and inspections.
Scaled site plan showing garage, existing buildings, setbacks and driveway; Footprint in m², height, roof and structural/foundation details; Application to Construct or Demolish and Schedule 1 designer information; Applicable Law checklist and any grading plan; Owner authorization where required
Town of Whitby 2026 Schedule N BGP-15 lists $10.65/m² for residential garages, carports, porches and accessory structures; BGP-55 lists a $305 permit minimum. Confirm final permit area and building class.
Whitby 2026 Schedule N prices garage/carport accessory class per m²; permit application table lists online or paper submissions, not the demolition-only email path.
Need the full project answer?
The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.
Open the garage / carport guide