Scope before arithmetic
Make sure the fee belongs to your project.
Whitby's permit submission table does NOT list demolition in the E-Portal; the Town uses email or paper. Confirm demolition area, structure type, utility disconnections and neighbouring risks, and prepare the current demolition application with supporting site documents. Before work, check heritage, conservation authority, grading and street/property impacts where applicable. The regular $305 residential/accessory fee does not cover construction waste, professional demolition services or other approvals.
Whitby's permit submission table does NOT list demolition in the E-Portal; the Town uses email or paper. Confirm demolition area, structure type, utility disconnections and neighbouring risks, and prepare the current demolition application with supporting site documents. Before work, check heritage, conservation authority, grading and street/property impacts where applicable. The regular $305 residential/accessory fee does not cover construction waste, professional demolition services or other approvals.
Identify demolition class: residential, accessory building or ICI. Prepare current Town demolition application, building location/site plan and utility clearance scope. Submit by email to buildingpermits@whitby.ca, in person at 3050 Garden St Unit 102 or Town Hall drop box. Budget applicable $305 flat charge or ICI per-area fee with minimum. Wait for issued permit and all required utility, site and heritage clearances before demolition.
Demolition Permit Application and relevant site plan; Structure type, size, location and adjoining buildings; Utility service isolation/disconnections and contractor scope; Any heritage or conservation authority approvals; Site grading and municipal boulevard/roadway impacts
Official sources behind this page
Whitby's permit submission table does NOT list demolition in the E-Portal; the Town uses email or paper. Confirm demolition area, structure type, utility disconnections and neighbouring risks, and prepare the current demolition application with supporting site documents. Before work, check heritage, conservation authority, grading and street/property impacts where applicable. The regular $305 residential/accessory fee does not cover construction waste, professional demolition services or other approvals.
Identify demolition class: residential, accessory building or ICI. Prepare current Town demolition application, building location/site plan and utility clearance scope. Submit by email to buildingpermits@whitby.ca, in person at 3050 Garden St Unit 102 or Town Hall drop box. Budget applicable $305 flat charge or ICI per-area fee with minimum. Wait for issued permit and all required utility, site and heritage clearances before demolition.
Demolition Permit Application and relevant site plan; Structure type, size, location and adjoining buildings; Utility service isolation/disconnections and contractor scope; Any heritage or conservation authority approvals; Site grading and municipal boulevard/roadway impacts
The Town's official 2026 Schedule N lists $305 flat for residential demolitions BGP-44 and accessory structures BGP-70; ICI demolition has a different per-square-metre class.
The Town's published demolition instructions direct applicants to buildingpermits@whitby.ca or the stated paper/drop-box options, rather than its standard residential E-Portal.
Need the full project answer?
The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.
Open the demolition guide