Whitby, Ontario / Project checklist

Whitby demolition permit checklist

Use a project-specific demolition permit checklist for Whitby, Ontario: documents, next steps, source review date and official references.

Check this for your address
Focused project answerLast verified Nov 9, 2026
Use this before you submit

5 items to prepare for this project.

This page is the submission checklist. For permit thresholds, size rules, zoning and the full project decision, use the main guide.

Open the main Whitby demolition rules

Project template

Your preparation checklist

Use it as a working list. The final submission still needs to match your actual scope and the City’s current requirements.

buildrules.caPROJECT PREPARATION

Demolition

Planning record, not municipal approval. Confirm the conditions and official requirements for your property.

Your preparation progress

0 of 5 ready

Your progress is saved in this browser. Project reference, date and notes stay in this tab until you leave.

Guide : buildrules.ca/whitby/demolition-permit · Sources reviewed 2026-11-09

What to do next

  1. Identify demolition class: residential, accessory building or ICI.
  2. Prepare current Town demolition application, building location/site plan and utility clearance scope.
  3. Submit by email to buildingpermits@whitby.ca, in person at 3050 Garden St Unit 102 or Town Hall drop box.
  4. Budget applicable $305 flat charge or ICI per-area fee with minimum.
  5. Wait for issued permit and all required utility, site and heritage clearances before demolition.

Official sources behind this page

Permit decisionDemolition permit required; email or paper filing

Whitby's permit submission table does NOT list demolition in the E-Portal; the Town uses email or paper. Confirm demolition area, structure type, utility disconnections and neighbouring risks, and prepare the current demolition application with supporting site documents. Before work, check heritage, conservation authority, grading and street/property impacts where applicable. The regular $305 residential/accessory fee does not cover construction waste, professional demolition services or other approvals.

Official sourceTown of WhitbyDemolition Permits: submission routes · Demolition applications by email or paper, not E-Portal
Verified2026-11-09Open proof
Application route, if a permit appliesSubmit buildingpermits@whitby.ca or in-person demolition package

Identify demolition class: residential, accessory building or ICI. Prepare current Town demolition application, building location/site plan and utility clearance scope. Submit by email to buildingpermits@whitby.ca, in person at 3050 Garden St Unit 102 or Town Hall drop box. Budget applicable $305 flat charge or ICI per-area fee with minimum. Wait for issued permit and all required utility, site and heritage clearances before demolition.

Official sourceTown of WhitbyDemolition Permits: submission routes · Demolition applications by email or paper, not E-Portal
Verified2026-11-09Open proof
Local checks and submission documentsResidential/accessory $305 flat; ICI different per m² rate

Demolition Permit Application and relevant site plan; Structure type, size, location and adjoining buildings; Utility service isolation/disconnections and contractor scope; Any heritage or conservation authority approvals; Site grading and municipal boulevard/roadway impacts

Official sourceTown of WhitbySchedule N to By-law 7220-17: 2026 Building Services Fees · BGP-73 below grade entrance $305 flat, BGP-55 $305 minimum, January 1 2026
Verified2026-11-09Open proof
2026 permit fee referenceResidential/accessory demolition: $305 flat permit

The Town's official 2026 Schedule N lists $305 flat for residential demolitions BGP-44 and accessory structures BGP-70; ICI demolition has a different per-square-metre class.

Official sourceTown of WhitbySchedule N to By-law 7220-17: 2026 Building Services Fees · BGP-73 below grade entrance $305 flat, BGP-55 $305 minimum, January 1 2026
Verified2026-11-09Open proof
Demolition submission routeWhitby demolition applications use email or paper

The Town's published demolition instructions direct applicants to buildingpermits@whitby.ca or the stated paper/drop-box options, rather than its standard residential E-Portal.

Official sourceTown of WhitbyDemolition Permits: submission routes · Demolition applications by email or paper, not E-Portal
Verified2026-11-09Open proof

Need the full project answer?

The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.

Open the demolition guide