Scope before arithmetic
Make sure the fee belongs to your project.
Changing use can alter Building Code occupancy/hazard classification, allowable zoning, exits, fire protection and accessibility even where no construction is planned. Review current legally approved use and proposed activity with Whitby Building Services (building@whitby.ca). The Town's permit submission table does not list a separate E-Portal Change of Use workflow; obtain the correct filing instructions directly instead of assuming the standard residential alteration flow.
Changing use can alter Building Code occupancy/hazard classification, allowable zoning, exits, fire protection and accessibility even where no construction is planned. Review current legally approved use and proposed activity with Whitby Building Services (building@whitby.ca). The Town's permit submission table does not list a separate E-Portal Change of Use workflow; obtain the correct filing instructions directly instead of assuming the standard residential alteration flow.
Identify existing lawful use and proposed new use. Ask Building Services if use change triggers permit even without building alterations and whether zoning permits the new activity. Prepare occupancy, exit, fire, accessibility and any construction documentation. Ask Town staff which Change of Use submission channel applies; it is not a separately listed E-Portal category. Budget the $305 BGP-45 fee plus separate approved work and wait for written permission before occupancy.
Existing lawful and proposed occupancy/use at property; Building floor area, planned occupants and layout; Exits, fire protection and accessibility considerations; Any accompanying renovation/structural or mechanical work; Current property zoning and any separate approvals
Official sources behind this page
Changing use can alter Building Code occupancy/hazard classification, allowable zoning, exits, fire protection and accessibility even where no construction is planned. Review current legally approved use and proposed activity with Whitby Building Services (building@whitby.ca). The Town's permit submission table does not list a separate E-Portal Change of Use workflow; obtain the correct filing instructions directly instead of assuming the standard residential alteration flow.
Identify existing lawful use and proposed new use. Ask Building Services if use change triggers permit even without building alterations and whether zoning permits the new activity. Prepare occupancy, exit, fire, accessibility and any construction documentation. Ask Town staff which Change of Use submission channel applies; it is not a separately listed E-Portal category. Budget the $305 BGP-45 fee plus separate approved work and wait for written permission before occupancy.
Existing lawful and proposed occupancy/use at property; Building floor area, planned occupants and layout; Exits, fire protection and accessibility considerations; Any accompanying renovation/structural or mechanical work; Current property zoning and any separate approvals
Town Schedule N BGP-45 lists a $305 flat fee, no HST, for Change of Use applications. This is only the City building-permit charge; work needed to meet new occupancy requirements may trigger other fees.
Whitby lists Change of Use as permit-required and publishes a distinct BGP-45 flat fee, but zoning, fire and other occupancy standards still apply.
Need the full project answer?
The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.
Open the change of use guide