Scope before arithmetic
Make sure the fee belongs to your project.
The Town E-Portal detailed documentation for Residential - Below Grade Entrance substitutes a Commitment to General Review for the general Schedule 1 and signed/sealed structural drawings for ordinary architectural drawings. The structural drawing package must show scaled plan, elevation, cross-section, guards and notes. The site plan identifies property lines, existing structures and setbacks. Current Town application table lists E-Portal and paper for this permit category, not email; pre-screening and payment are not actual permit issuance. Check drainage, grading, zoning and conservation requirements separately.
Whitby requires a dedicated residential below-grade entrance permit with Professional Engineer signed/sealed walkout structural drawings and Commitment to General Review.
Submit site plan with setbacks, engineer-sealed structural plans and Commitment to General Review, plus owner authorization where applicable. This application uses E-Portal or paper rather than demolition-style email filing.
2026 Town Schedule N lists $305 flat with no HST for Below Grade Entrance/Underpinning. Plan for engineering and separate zoning, grading or conservation approvals where applicable.
Official sources behind this page
Whitby requires a dedicated residential below-grade entrance permit with Professional Engineer signed/sealed walkout structural drawings and Commitment to General Review.
Submit site plan with setbacks, engineer-sealed structural plans and Commitment to General Review, plus owner authorization where applicable. This application uses E-Portal or paper rather than demolition-style email filing.
2026 Town Schedule N lists $305 flat with no HST for Below Grade Entrance/Underpinning. Plan for engineering and separate zoning, grading or conservation approvals where applicable.
Town documentation explicitly requires engineer-designed plans, elevations, cross sections, guard details and construction notes for basement walkouts, plus Commitment to General Review in lieu of Schedule 1.
Schedule N to By-law 7220-17 BGP-73 effective 2026-01-01; the fee does not cover professional engineer design or separate grading/conservation permission.