Project template
Your preparation checklist
Use it as a working list. The final submission still needs to match your actual scope and the City’s current requirements.
Basement entrance / walkout
Planning record, not municipal approval. Confirm the conditions and official requirements for your property.
0 of 6 ready
Your progress is saved in this browser. Project reference, date and notes stay in this tab until you leave.
What to do next
- Confirm entrance location, zoning setbacks and drainage/lot grading constraints.
- Hire a Professional Engineer of Ontario to design and seal the walkout foundation/guard drawings.
- Prepare the required Application to Construct or Demolish, Commitment to General Review, site plan and structural drawings.
- Submit Residential - Below Grade Entrance through Whitby E-Portal or on paper, not the email-only demolition route.
- Complete pre-screening and pay the assessed permit fee; the Town lists $305 under BGP-73.
- Wait for issued permit, then schedule required structural/foundation/drainage inspections.
Official sources behind this page
Whitby requires a dedicated residential below-grade entrance permit with Professional Engineer signed/sealed walkout structural drawings and Commitment to General Review.
Submit site plan with setbacks, engineer-sealed structural plans and Commitment to General Review, plus owner authorization where applicable. This application uses E-Portal or paper rather than demolition-style email filing.
2026 Town Schedule N lists $305 flat with no HST for Below Grade Entrance/Underpinning. Plan for engineering and separate zoning, grading or conservation approvals where applicable.
Town documentation explicitly requires engineer-designed plans, elevations, cross sections, guard details and construction notes for basement walkouts, plus Commitment to General Review in lieu of Schedule 1.
Schedule N to By-law 7220-17 BGP-73 effective 2026-01-01; the fee does not cover professional engineer design or separate grading/conservation permission.