Your preparation checklist
Use it as a working list. The final submission still needs to match your actual scope and the City’s current requirements.
Basement apartment / secondary suite
Planning record, not municipal approval. Confirm the conditions and official requirements for your property.
0 of 5 ready
Your progress is saved in this browser. Project reference, date and notes stay in this tab until you leave.
What to do next
- Check dwelling and property eligibility
- Confirm parking and zoning conditions
- Prepare the permit drawings
- Apply before construction and complete required inspections
Official sources behind this page
Vaughan states that a secondary suite must comply with its Zoning By-law and limits eligibility to specified dwelling types and locations.
For a new unit, Vaughan directs owners to submit a building permit application with professionally prepared drawings.
The City states that one additional properly surfaced parking space is required per additional residential unit under the cited criteria.
Vaughan Building Standards confirmed October 28, 2026 that the secondary-suite and interior-alteration rates apply to different portions of the basement, not twice to the same floor area. For an illustrative 80 m² basement converted entirely into one new unit, the published $21.82/m² rate gives $1,745.60 in base permit fees before any applicable plumbing, other charges or returnable deposit. The City decides applicable floor area, classification and final charges.
For qualifying alterations or secondary suites in detached, semi-detached or townhouse buildings, Schedule F lists a returnable fee of $2,575, or the building-permit fee if lower. The schedule excludes a change of use without construction. Confirm applicability and conditions for return with Vaughan.
Vaughan Building Standards: Suite area uses $21.82/m²; separate personal-use area $7.30/m². The City identified $21.20 per plumbing fixture and a returnable fee capped at $2,575 or the building permit fee if lower. Exterior work may add charges. The reply is retained in BuildRules research records. This is not a property-specific approval or municipal endorsement.
Need the full project answer?
The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.
Open the basement apartment / secondary suite guide