Project template
Your preparation checklist
Use it as a working list. The final submission still needs to match your actual scope and the City’s current requirements.
0 of 5 ready
Your progress is saved in this browser. Come back whenever you’re ready.
What to do next
- Do not demolish before confirming the wall type
- Document existing framing and rooms
- Have the new structural path designed where required
- Submit the interior-alteration permit package
Official sources behind this page
Toronto lists adding or removing walls as structural or material alterations that require a building permit.
Toronto's interior-alteration guide requires drawings appropriate to the proposed changes.
Where structural framing changes, the permit package must document the proposed construction.
Need the full project answer?
The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.
Open the wall removal / structural alteration guide