Garden suite
Planning record, not municipal approval. Confirm the conditions and official requirements for your property.
0 of 5 ready
Your progress is saved in this browser. Project reference, date and notes stay in this tab until you leave.
What to do next
- Review the proposed location and access route
- Discuss tree impacts early
- Confirm site feasibility before detailed design
Official sources behind this page
Apply through Toronto Building with the required forms and drawings.
Garden suites may be allowed in R, RD, RS, RT and RM zones under the city-wide by-law, subject to applicable standards. Check the zoning map and whether a site-specific exception, a former by-law or a transition provision applies. The City reports one property-specific appeal of the 2025 amendments.
Under the general height clause, the maximum is 4.0 m if the suite is less than 7.5 m from the residential building, or 6.3 m if it is at least 7.5 m away. The general limit is two storeys within those heights. Separate wall-to-wall spacing rules and exceptions apply under 150.7.60.30 and 150.7.60.31.
The general gross floor area cap is 60 m² for one storey and 120 m² otherwise, and the suite must be smaller in gross floor area than the residential building. Check the by-law calculation and transition exceptions. Rear and side setbacks must be checked separately under 150.7.60.20 and 150.7.60.21.
Toronto Building requires principal access and firefighting access. Show the route on your plans and confirm the applicable travel distance, clear width and height with Toronto Building before fixing the layout.
Prepare the application, site and grading plans, floor and roof plans, elevations and sections. Review the complete City checklist for project-specific forms. If work could damage a private or City tree, consult Urban Forestry and confirm the required tree documentation.