Who may prepare your drawings?
For Part 9 residential work, Ottawa lists a BCIN designer, architect, engineer or a qualifying homeowner exemption in its Schedule 1 process. The correct option depends on scope and design responsibility.
A BCIN alone does not mean a person holds every required qualification class. Verify the individual or organization against Ontario’s current QuARTS registry.
What should the design quote include?
Ottawa calls for a completed application and a fully dimensioned set of scaled drawings. Depending on the project, other documents can include energy-efficiency summaries, mechanical design, truss details or engineered shoring.
- Write a one-page project scope with affected floors and proposed changes.
- Ask who signs the applicable Schedule 1 and which qualification or exemption applies.
- Compare itemized drawing deliverables, revisions and municipal response support.
- Verify the named designer or organization in QuARTS before hiring.
Directory coverage is not a qualification check
BuildRules lists companies that declare service areas and specialities. A company must be checked individually in the official registry before it can be described as BCIN-qualified for your specific work. Sponsored placement is never a qualification.
Official sources and verification dates
These documents support the stated permit, qualification or data-methodology facts. They do not certify any directory company. Follow the original source before making a consequential decision.
Drawings, Schedule 1, other required documentation · Reviewed 2026-10-20
Current qualifying individuals and firms · Reviewed 2026-10-20
Homeowner design responsibility exemption · Reviewed 2026-10-20