There is no single Ontario building permit price or approval date. Compare the published project guidance for each municipality, then open the original source before filing.

30project categories
62municipalities covered
2026-11-12latest guide review

Compare project costs and timing

Start with the work you're planning.

Every note is drawn from a published BuildRules project guide. A blank dollar figure means no reliable fixed amount is provided in that guide—not that the permit is free.

Compare how two cities describe the same project

Two cities. Two municipal source trails.

Look at the published fee basis and timeline side by side. Different application classifications or extra reviews can make the numbers non-comparable. These are not quotes.

What the published guidance can actually tell you

15municipal project guides
6guides with a dollar-denominated fee note
2guides stating a specific review duration without a general qualification

A dollar amount is evidence from the reviewed guide, not a guaranteed final fee. Check the project classification and updated municipal schedule. Published review durations describe specific streams or conditions, not a promise of overall project completion. Additional charges, zoning reviews, other approvals and incomplete applications can change the actual total.

Windows / doors

15 municipal guides with source-reviewed notes. Guides with published dollar amounts appear first; those figures still need current confirmation.

Download source-linked CSV
MunicipalityFee guidanceProcessing and timingEvidence
BramptonWindows / doorsAmount published in reviewed guide
Brampton's 2026 residential fee schedule lists $133.61 for each new window or door opening, while the general minimum… Read complete fee guidance

Brampton's 2026 residential fee schedule lists $133.61 for each new window or door opening, while the general minimum building-permit fee for a qualifying stand-alone residential permit is $326.21. Do not quote $133.61 as the total permit amount without checking how the City applies the minimum and any additional work.

Brampton's homeowner permit page states its Standard Permit Application Service provides review within 10 business days for a complete renovation application. Other approvals, missing information or structural design issues may extend the timeline.

LondonWindows / doorsAmount published in reviewed guide
No London building-permit fee for a genuine same-size window/door replacement without regulated structural changes. New or… Read complete fee guidance

No London building-permit fee for a genuine same-size window/door replacement without regulated structural changes. New or enlarged openings can require the B-7 residential alteration permit (general Group C index $3.68/m² with applicable Part 9 $260.37 minimum), but the City must classify exact scope and assessed area; do not quote a universal per-window fee.

Same-size replacements listed as exempt have no City building-permit review. Where a new/enlarged opening needs a permit, London starts the review clock only after a complete accepted application; window/door-specific issuance time unverified.

OshawaWindows / doorsAmount published in reviewed guide
No Oshawa building-permit fee for a qualifying same-size window/door replacement in a house. Where a replacement is… Read complete fee guidance

No Oshawa building-permit fee for a qualifying same-size window/door replacement in a house. Where a replacement is permit-regulated, 2026 Schedule B item 78 lists $9.65 per linear metre of window or door width, subject to general $160 minimum and final City assessment; other structural alteration classes may apply.

No building permit review for exempt same-size house replacement. New/enlarged or otherwise regulated openings use the City's permit process, with no specific guaranteed issuance time verified.

OttawaWindows / doorsAmount published in reviewed guide
For a permitted homeowner renovation, Ottawa's January 2026 Building Code fee schedule generally assesses $12.75 per $1,000… Read complete fee guidance

For a permitted homeowner renovation, Ottawa's January 2026 Building Code fee schedule generally assesses $12.75 per $1,000 or part of the estimated construction value, with a $117 minimum. This is not a universal fee for all window replacements; qualifying same-opening replacements need no building permit. Confirm classification for a larger project.

For eligible complete small homeowner project applications, Ottawa targets a first review within 5 business days; this is not a guarantee of issuance or applicable to all complex projects. Check whether structural and heritage approvals change the review path.

TorontoWindows / doorsAmount published in reviewed guide
A straightforward same-opening window or door replacement that qualifies for Toronto's exemption has no building-permit… Read complete fee guidance

A straightforward same-opening window or door replacement that qualifies for Toronto's exemption has no building-permit fee. For new or altered openings, the fee depends on how the City classifies the permitted work; the 2026 minimum permit fee is $214.79 where a building permit applies. Confirm project classification before budgeting.

Simple same-opening replacement can fall outside the building-permit process. Structural or opening changes should be reviewed before ordering custom units.

WhitbyWindows / doorsAmount published in reviewed guide
Whitby 2026 Schedule N BGP-11 typical residential alteration rate $10.65 per m², subject to a $305 minimum (BGP-55), if the… Read complete fee guidance

Whitby 2026 Schedule N BGP-11 typical residential alteration rate $10.65 per m², subject to a $305 minimum (BGP-55), if the City classifies the new/enlarged opening in that category. An unaltered same-opening swap may have a different permit outcome; no universal per-window fee verified.

No project-specific Whitby window/door permit timeframe established in the current Building Permits page. The Town pre-screens the submission, reviews full documents after acceptance and payment, and may require structural corrections.

CambridgeWindows / doors

Confirm the current Cambridge permit fee for the exact project class before filing.

Confirm the current municipal review timeline after the application is accepted as complete.

Greater SudburyWindows / doors

Greater Sudbury adjusts its fees annually. Ask Building Services to confirm the current fee for your application.

Confirm the current municipal service standard.

GuelphWindows / doors

Check the current Guelph building permit fee schedule linked below.

Confirm the current municipal service standard.

HamiltonWindows / doors

Confirm the current Hamilton permit fee for the exact scope before filing.

Confirm the current municipal review stream after a complete application is submitted.

KitchenerWindows / doors
No Kitchener building-permit fee for qualifying same-opening replacement with unchanged framing and no fire-resistance… Read complete fee guidance

No Kitchener building-permit fee for qualifying same-opening replacement with unchanged framing and no fire-resistance rating. Enlarged/new or structural/fire-rated openings need permit and fee assessment.

No building-permit review for a qualifying same-opening replacement. New/enlarged opening review depends on a complete structural submission and building classification.

MiltonWindows / doors

Confirm the applicable Milton building permit fee from the municipality's current fee schedule.

Check Milton's current review timeline once a complete application is submitted.

MississaugaWindows / doors

Confirm the current Mississauga permit fee for the exact scope before filing.

Confirm the current municipal review stream after a complete application is submitted.

OakvilleWindows / doors

Confirm the current Oakville permit fee for the exact scope before filing.

Confirm the current municipal review stream after a complete application is submitted.

VaughanWindows / doors

Confirm the current Vaughan permit fee for the exact scope before filing.

Vaughan lists 10 business days as its usual processing period for a complete single-family dwelling permit application. This is not a guarantee of final issuance or a total project timeline; incomplete applications, zoning or other approvals can extend the process. Confirm the classification with Building Standards.

Important: municipal permit fees may depend on the precise scope, construction value, area, additional charges and current fee schedule. A target review period is not an approval promise; incomplete applications, zoning and applicable-law reviews can change the timing. This index does not replace an official municipal quotation or decision.

Now make it property-specific

The same project can have different constraints at two addresses.

Use the property check to see the municipal route and available zoning context, then review the official instructions for the proposed work.

Try a source-linked deck or shed permit pre-check →

Check an Ontario address

Understand what the index is showing.

Are these guaranteed permit fees?

No. The notes reproduce available reviewed guidance from the relevant municipal guide. Actual fees are set by the municipality and depend on the application.

Does the processing timeline include every approval?

Not necessarily. Zoning, variances, other applicable-law reviews, missing documents and inspections can follow different processes. Check the official source for your exact proposal.

Why don't some rows show a dollar amount?

Because BuildRules does not invent a number when a verified fixed fee is not available for that project. Follow the municipal source and ask the issuing authority for the current fee schedule.