Ontario Permit Cost Atlas / Source-reviewed guidance

Before you budget the permit,
check the city.

There is no single Ontario building permit price or approval date. Compare the published project guidance for each municipality, then open the original source before filing.

30project categories
62municipalities covered
2026-11-12latest guide review

Compare project costs and timing

Start with the work you're planning.

Every note is drawn from a published BuildRules project guide. A blank dollar figure means no reliable fixed amount is provided in that guide—not that the permit is free.

Compare how two cities describe the same project

Two cities. Two municipal source trails.

Look at the published fee basis and timeline side by side. Different application classifications or extra reviews can make the numbers non-comparable. These are not quotes.

What the published guidance can actually tell you

5municipal project guides
2guides with a dollar-denominated fee note
0guides stating a specific review duration without a general qualification

A dollar amount is evidence from the reviewed guide, not a guaranteed final fee. Check the project classification and updated municipal schedule. No reliable stand-alone processing duration is published in this selection. Additional charges, zoning reviews, other approvals and incomplete applications can change the actual total.

Driveway widening

5 municipal guides with source-reviewed notes. Guides with published dollar amounts appear first; those figures still need current confirmation.

Download source-linked CSV
MunicipalityFee guidanceProcessing and timingEvidence
TorontoDriveway wideningAmount published in reviewed guide

Street Work Permit fees apply. Toronto’s 2026 Zoning Applicable Law Certificate fee for “all other proposals,” including driveway widening, is $214.79 when that review is used.

Toronto says applications for new driveway or walkway construction should be submitted at least eight weeks before the scheduled work. That is a planning lead time, not a guaranteed approval date.

WaterlooDriveway wideningAmount published in reviewed guide
Waterloo curb-cut fee: $150 per approved City permit plus $160 per metre of curb cut. These charges do not apply… Read complete fee guidance

Waterloo curb-cut fee: $150 per approved City permit plus $160 per metre of curb cut. These charges do not apply automatically to driveway paving without a curb cut. Private paving, landscaping and zoning permissions are separate.

Call Waterloo at least two weeks before paving for free water shut-off valve marking. Following curb-cut approval and payment, the City usually arranges curb work within about two weeks. This is an estimate, not a guaranteed permit or work date.

LondonDriveway widening
No London building-permit charge for ordinary permit-exempt driveway paving or widening. Work-approval / curb-cut permit… Read complete fee guidance

No London building-permit charge for ordinary permit-exempt driveway paving or widening. Work-approval / curb-cut permit charges, infrastructure restoration, contractor paving costs and other approvals are separate; the project-specific work-approval invoice has not been verified here.

No building-permit review for an exempt driveway widening. For work affecting the municipal curb or boulevard, contact streetpermit@london.ca to confirm application, inspection, scheduling and permit timeframe.

MississaugaDriveway widening
No City building permit fee for ordinary exempt driveway widening. Access modification / curb cut and any separate public… Read complete fee guidance

No City building permit fee for ordinary exempt driveway widening. Access modification / curb cut and any separate public property, restoration, tree or grading fees are NOT established here; obtain the municipal invoice for the exact project.

No building permit processing for exempt driveway paving. If a curb cut or municipal boulevard modification is needed, the separate access modification process has its own timing, not verified here.

OshawaDriveway widening

No fee has been verified for this project. Ask Oshawa which application class applies, which deposits or other approvals are extra, and when payment is due.

No Oshawa project-specific review period has been verified here. Ask when the completeness review begins and which outside approvals must be obtained first.

Important: municipal permit fees may depend on the precise scope, construction value, area, additional charges and current fee schedule. A target review period is not an approval promise; incomplete applications, zoning and applicable-law reviews can change the timing. This index does not replace an official municipal quotation or decision.

Now make it property-specific

The same project can have different constraints at two addresses.

Use the property check to see the municipal route and available zoning context, then review the official instructions for the proposed work.

Try a source-linked deck or shed permit pre-check →

Check an Ontario address

Understand what the index is showing.

Are these guaranteed permit fees?

No. The notes reproduce available reviewed guidance from the relevant municipal guide. Actual fees are set by the municipality and depend on the application.

Does the processing timeline include every approval?

Not necessarily. Zoning, variances, other applicable-law reviews, missing documents and inspections can follow different processes. Check the official source for your exact proposal.

Why don't some rows show a dollar amount?

Because BuildRules does not invent a number when a verified fixed fee is not available for that project. Follow the municipal source and ask the issuing authority for the current fee schedule.