Ontario Permit Cost Atlas / Source-reviewed guidance

Before you budget the permit,
check the city.

There is no single Ontario building permit price or approval date. Compare the published project guidance for each municipality, then open the original source before filing.

30project categories
62municipalities covered
2026-11-12latest guide review

Compare project costs and timing

Start with the work you're planning.

Every note is drawn from a published BuildRules project guide. A blank dollar figure means no reliable fixed amount is provided in that guide—not that the permit is free.

Compare how two cities describe the same project

Two cities. Two municipal source trails.

Look at the published fee basis and timeline side by side. Different application classifications or extra reviews can make the numbers non-comparable. These are not quotes.

What the published guidance can actually tell you

24municipal project guides
4guides with a dollar-denominated fee note
2guides stating a specific review duration without a general qualification

A dollar amount is evidence from the reviewed guide, not a guaranteed final fee. Check the project classification and updated municipal schedule. Published review durations describe specific streams or conditions, not a promise of overall project completion. Additional charges, zoning reviews, other approvals and incomplete applications can change the actual total.

Basement renovation

24 municipal guides with source-reviewed notes. Guides with published dollar amounts appear first; those figures still need current confirmation.

Download source-linked CSV
MunicipalityFee guidanceProcessing and timingEvidence
BramptonBasement renovationAmount published in reviewed guide
The City of Brampton's February 2026 fee schedule and Basement Finish package list $326.21 for a stand-alone residential… Read complete fee guidance

The City of Brampton's February 2026 fee schedule and Basement Finish package list $326.21 for a stand-alone residential Basement Finish permit. A separate dwelling unit, below-grade entrance, new openings, structural work or other extra scopes must not be priced as a single $326.21 basement-finish permit.

The February 2026 Basement Finish package uses Brampton's Standard 10 Day Permit Application Service. This is a review target for a complete submission, not guaranteed time to obtain all approvals.

OttawaBasement renovationAmount published in reviewed guide
Ottawa's January 2026 Building Code fee schedule generally prices homeowner renovation work with no new floor area at… Read complete fee guidance

Ottawa's January 2026 Building Code fee schedule generally prices homeowner renovation work with no new floor area at $12.75 per $1,000 or part thereof of assessed construction value, with a $117 minimum. A secondary dwelling, structural changes or additional associated permits may have separate requirements; request a scope-specific fee assessment.

Ottawa's dedicated finished-basement page publishes a target of 5 business days for the first review of a complete application under the enhanced service level. This does not include design, additional approvals, response to deficiencies or permit issuance.

TorontoBasement renovationAmount published in reviewed guide
Toronto's Building Permit Fees effective Jan. 1, 2026 list a $6.20/m² service index for stand-alone 'Basements - Finishing… Read complete fee guidance

Toronto's Building Permit Fees effective Jan. 1, 2026 list a $6.20/m² service index for stand-alone 'Basements - Finishing - in Dwellings/Townhouses', calculated using the floor area affected by the proposed work, subject to the $214.79 minimum building-permit fee where a permit is required. This finishes-only rate does NOT price a new secondary dwelling unit, structural work, plumbing/HVAC permits, underpinning or changes of use. Additional applicable fees, zoning/design and inspections must be confirmed by Toronto Building. Source: City of Toronto, Building Permit Fees, sections Fee Calculations and E (reviewed Oct. 20, 2026).

Depends heavily on whether the project is a simple renovation, structural alteration or secondary-suite project.

VaughanBasement renovationAmount published in reviewed guide
Vaughan's 2026 By-law 051-2026, Schedule F, lists $7.30/m² for a Part 9 residential interior alteration building-permit… Read complete fee guidance

Vaughan's 2026 By-law 051-2026, Schedule F, lists $7.30/m² for a Part 9 residential interior alteration building-permit class, subject to a $195 minimum where a permit is required. This is a CLASSIFICATION-SPECIFIC rate, not a guaranteed total cost for any basement renovation. New secondary units, structural work, underpinning, basement walk-ups, plumbing and other scope can have different fee classes or extra charges. Qualifying residential alterations may also carry a separate returnable amount (up to $2,575 or the building-permit fee, whichever is less), which is not the non-refundable permit price. Confirm the correct scope and fees with Vaughan. Source: City of Vaughan, 2026 Fees and Charges By-law 051-2026, Schedule F (reviewed Nov. 12, 2026).

Confirm the current municipal review stream after the application is accepted as complete.

AjaxBasement renovation

Confirm the current Ajax fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

AuroraBasement renovation

Confirm the current Aurora fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

Brock TownshipBasement renovation

Confirm the current Brock fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

CaledonBasement renovation

Confirm the current Caledon fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

ClaringtonBasement renovation

Confirm the current Clarington fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

GuelphBasement renovation

Check the current Guelph building permit fee schedule linked below.

Confirm the current municipal service standard.

HamiltonBasement renovation

Confirm the current Hamilton fee schedule for the exact permit class.

Confirm the current municipal review stream after the application is accepted as complete.

King TownshipBasement renovation

Confirm the current King Township fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

KitchenerBasement renovation

Confirm the current Kitchener permit fee for the exact project class before filing.

Confirm the current municipal review timeline after the application is accepted as complete.

LondonBasement renovation

Confirm the current London permit fee for the exact project class before filing.

London lists a 10-business-day statutory review timeline for renovations to houses once the application is complete.

MarkhamBasement renovation

Confirm the current Markham fee schedule for the exact permit class.

Confirm the current municipal review stream after the application is accepted as complete.

MiltonBasement renovation

Confirm the current Milton fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

MississaugaBasement renovation

Confirm the current Mississauga fee schedule for the exact permit class.

Confirm the current municipal review stream after the application is accepted as complete.

NewmarketBasement renovation

Confirm the current Newmarket fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

OakvilleBasement renovation

Confirm the current Oakville fee schedule for the exact permit class.

Confirm the current municipal review stream after the application is accepted as complete.

OshawaBasement renovation

Confirm the current Oshawa permit fee for the exact project class before filing.

Confirm the current municipal review timeline after the application is accepted as complete.

PickeringBasement renovation

Confirm the current Pickering fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

Richmond HillBasement renovation

Confirm the current Richmond Hill fee schedule for the exact permit class before filing.

Confirm the current municipal review timeline after a complete application is accepted.

WaterlooBasement renovation

Confirm the current Waterloo permit fee for the exact project class before filing.

Waterloo lists a 10-business-day processing timeline for renovations to single-detached, semi-detached and townhouse homes once complete.

WhitbyBasement renovation

Confirm the current Whitby permit fee for the exact project class before filing.

Confirm the current municipal review timeline after the application is accepted as complete.

Important: municipal permit fees may depend on the precise scope, construction value, area, additional charges and current fee schedule. A target review period is not an approval promise; incomplete applications, zoning and applicable-law reviews can change the timing. This index does not replace an official municipal quotation or decision.

Now make it property-specific

The same project can have different constraints at two addresses.

Use the property check to see the municipal route and available zoning context, then review the official instructions for the proposed work.

Try a source-linked deck or shed permit pre-check →

Check an Ontario address

Understand what the index is showing.

Are these guaranteed permit fees?

No. The notes reproduce available reviewed guidance from the relevant municipal guide. Actual fees are set by the municipality and depend on the application.

Does the processing timeline include every approval?

Not necessarily. Zoning, variances, other applicable-law reviews, missing documents and inspections can follow different processes. Check the official source for your exact proposal.

Why don't some rows show a dollar amount?

Because BuildRules does not invent a number when a verified fixed fee is not available for that project. Follow the municipal source and ask the issuing authority for the current fee schedule.