Your preparation checklist
Use it as a working list. The final submission still needs to match your actual scope and the City’s current requirements.
0 of 4 ready
Your progress is saved in this browser. Come back whenever you’re ready.
What to do next
- Define whether fixtures are replaced, added or relocated
- Identify drain, waste, vent and water changes
- Prepare the applicable plans
- Submit the plumbing/building permit and book required inspections
Official sources behind this page
Ottawa lists alterations, additions or extensions to a plumbing system as permit-required work.
Ottawa’s project list excludes replacing existing fixtures from the plumbing permit trigger.
Ottawa publishes plumbing underground, plumbing rough-in and plumbing final as inspection stages.