Oshawa, Ontario / Permit cost

What does a sump pump permit cost?

See the published permit fee information BuildRules has verified for a sump pump project in Oshawa, Ontario, with the source and limits visible.

Need the permit rules rather than just the fee? Read Oshawa sump pump permit requirements and zoning checks

Check this for your address
Focused project answerLast verified Nov 9, 2026
Published fee information

Oshawa Schedule B 2026 item 98 lists $82 for each sump, manhole, catchbasin or interceptor. General building-permit application minimum is $160. New site services or additional plumbing may use other fee classes; permit invoice depends on actual scope.

Use this as a municipal-fee reference, not as the total project budget. Design, engineering, related applications and construction costs are separate.

Scope before arithmetic

Make sure the fee belongs to your project.

The City portal explicitly lists sump pumps, inside storm/sanitary piping, manholes, catchbasins and site services under Plumbing. Determine whether the scope is a new sump and pump, replacement in an approved existing setup, new drain and storm sewer connection or excavation/site service work. The 2026 fee schedule charges $82 per sump device and can charge under other plumbing service classes if the job includes connections or piping, with $160 minimum permit fee unless a higher charge. A municipal plumbing permit is not a grant of authority to discharge onto public streets or neighbour lands. Confirm discharge route and grading before installing.

Permit decisionSump pumps use Plumbing permit class; connections assessed separately

The City portal explicitly lists sump pumps, inside storm/sanitary piping, manholes, catchbasins and site services under Plumbing. Determine whether the scope is a new sump and pump, replacement in an approved existing setup, new drain and storm sewer connection or excavation/site service work. The 2026 fee schedule charges $82 per sump device and can charge under other plumbing service classes if the job includes connections or piping, with $160 minimum permit fee unless a higher charge. A municipal plumbing permit is not a grant of authority to discharge onto public streets or neighbour lands. Confirm discharge route and grading before installing.

Application route, if a permit appliesProvide sump and discharge connection drawings in Plumbing category

Identify sump installation versus like-for-like replacement and all related plumbing/drain changes. Confirm approved discharge route and whether municipal storm/site connections are affected. Use Oshawa Plumbing application category and provide sump, piping and connection layout. Estimate $82 per item but account for $160 minimum and any separate site service fee class. Obtain required permits and inspection stages before concealing drainage work.

Local checks and submission documents2026 sump item $82, but building-permit minimum $160

Existing and proposed sump location and system function; New or existing storm/sanitary drain piping and connection; Discharge location, lot drainage and any municipal infrastructure impacts; Any backflow device or interceptor details; Whether standalone Plumbing project or part of broader construction

Official sources behind this page

Permit decisionSump pumps use Plumbing permit class; connections assessed separately

The City portal explicitly lists sump pumps, inside storm/sanitary piping, manholes, catchbasins and site services under Plumbing. Determine whether the scope is a new sump and pump, replacement in an approved existing setup, new drain and storm sewer connection or excavation/site service work. The 2026 fee schedule charges $82 per sump device and can charge under other plumbing service classes if the job includes connections or piping, with $160 minimum permit fee unless a higher charge. A municipal plumbing permit is not a grant of authority to discharge onto public streets or neighbour lands. Confirm discharge route and grading before installing.

Official sourceCity of OshawaBuilding Permits · Residential permit triggers and project resources
Verified2026-11-09Open proof
Application route, if a permit appliesProvide sump and discharge connection drawings in Plumbing category

Identify sump installation versus like-for-like replacement and all related plumbing/drain changes. Confirm approved discharge route and whether municipal storm/site connections are affected. Use Oshawa Plumbing application category and provide sump, piping and connection layout. Estimate $82 per item but account for $160 minimum and any separate site service fee class. Obtain required permits and inspection stages before concealing drainage work.

Official sourceCity of OshawaBuilding Permits · Residential permit triggers and project resources
Verified2026-11-09Open proof
Local checks and submission documents2026 sump item $82, but building-permit minimum $160

Existing and proposed sump location and system function; New or existing storm/sanitary drain piping and connection; Discharge location, lot drainage and any municipal infrastructure impacts; Any backflow device or interceptor details; Whether standalone Plumbing project or part of broader construction

Official sourceCity of OshawaBuilding By-law 33-2009 as amended 118-2025: 2026 Schedule B · 2026 effective January 1 rates, minimum $160, Schedule C application documents
Verified2026-11-09Open proof
Sump rate versus minimum$82 per sump item does not automatically mean an $82 total bill

Schedule B item 98 sets an $82 device rate, while Part A establishes a general $160 minimum application fee. Other pipe and site service charges can apply.

Official sourceCity of OshawaBuilding By-law 33-2009 as amended 118-2025: 2026 Schedule B · 2026 effective January 1 rates, minimum $160, Schedule C application documents
Verified2026-11-09Open proof