Scope before arithmetic
Make sure the fee belongs to your project.
Confirmed directly with the municipality: Oshawa Building Services provided written clarification to BuildRules on November 12, 2026. House solar panels use item 75, not a combination of items 75 and 99. The permit minimum replaces a lower calculated fee. This confirmation covers the stated point only, not municipal approval of a property or endorsement of BuildRules. Oshawa Building Services clarified on November 12, 2026 that item 75 applies to solar panels on houses and that only one category applies. The applicable fee depends on the number of panels; if the calculation is below the minimum permit fee, the minimum is charged. Confirm the total and project classification with the City. Roof structure, attachment and electrical approvals remain separate considerations.
Oshawa directs solar panels to the Renewable Energy application category. The City confirmed item 75 applies to house solar panels, only one solar fee category applies, and the minimum fee is charged if the calculated amount is lower. Roof loading and electrical approvals are separate.
Prepare roof and mounting information, panel count and electrical design. Confirm the panel-count calculation and minimum fee with Oshawa; electrical approvals are separate. Submit the Renewable Energy application and obtain required inspections.
House vs other building class and number/type of panels; Roof location plan, racking, fastening and supporting structure; Designer/engineer roof loading information where needed; Manufacturer equipment specification and project construction-value estimate; Electrical connections and separate ESA application; Other site, zoning and conservation approvals if required
Official sources behind this page
Oshawa directs solar panels to the Renewable Energy application category. The City confirmed item 75 applies to house solar panels, only one solar fee category applies, and the minimum fee is charged if the calculated amount is lower. Roof loading and electrical approvals are separate.
Prepare roof and mounting information, panel count and electrical design. Confirm the panel-count calculation and minimum fee with Oshawa; electrical approvals are separate. Submit the Renewable Energy application and obtain required inspections.
House vs other building class and number/type of panels; Roof location plan, racking, fastening and supporting structure; Designer/engineer roof loading information where needed; Manufacturer equipment specification and project construction-value estimate; Electrical connections and separate ESA application; Other site, zoning and conservation approvals if required
Oshawa confirmed item 75 applies to solar panels on houses and only one fee category applies. The 2026 schedule lists $160 per 10 panels; the City applies the minimum when the calculated fee is lower. Confirm the total directly.
Oshawa Building Services: House solar panels use item 75, not a combination of items 75 and 99. The permit minimum replaces a lower calculated fee. The reply is retained in BuildRules research records. This is not a property-specific approval or municipal endorsement.