What does a new house permit cost?

See the published permit fee information BuildRules has verified for a new house project in Oshawa, Ontario, with the source and limits visible.

Need the permit rules rather than just the fee? Read Oshawa new house permit requirements and zoning checks

Check this for your address
Focused project answerLast verified Nov 9, 2026
Published fee information

Oshawa 2026 Building By-law Schedule B Part B item 23: Group C House / Accessory building for human habitation $15.56 per m² of chargeable building floor area, minimum $160. Development charges, water/sewer services, roadway deposits, builder and design costs separate.

Use this as a municipal-fee reference, not as the total project budget. Design, engineering, related applications and construction costs are separate.

Scope before arithmetic

Make sure the fee belongs to your project.

Oshawa's Building By-law Schedule C residential new construction application requires Applicable Law Checklist, HVAC Design Summary including heat loss/gain and SB-12 EEDS, Regional Municipality of Durham sewer/water approval, development charge information (City, Region, school boards), TARION registration, Roadway Restoration Deposit Form and applicable design info. Plans may include an approved site plan, survey, approved grading plan, architectural/structural/HVAC designs, on-site septic and plumbing details. Do not treat model certification as site-specific building permit issuance.

Permit decisionNew home requires permit and complete servicing/energy design

Oshawa's Building By-law Schedule C residential new construction application requires Applicable Law Checklist, HVAC Design Summary including heat loss/gain and SB-12 EEDS, Regional Municipality of Durham sewer/water approval, development charge information (City, Region, school boards), TARION registration, Roadway Restoration Deposit Form and applicable design info. Plans may include an approved site plan, survey, approved grading plan, architectural/structural/HVAC designs, on-site septic and plumbing details. Do not treat model certification as site-specific building permit issuance.

Application route, if a permit appliesSubmit site, grading, HVAC/SB-12 and servicing documents

Choose New Construction-Residential or certified Production Builder project class as appropriate. Confirm zoning, lot, grade, access and Durham Region servicing before full submission. Prepare Schedule C forms, SB-12 energy/HVAC, designer documentation and development charge materials. Supply survey, site grading and scaled architectural/structural drawings. Budget $15.56/m² for house building class plus assessed development/service charges, and obtain permit before building.

Local checks and submission documents2026 house fee $15.56/m²; development charges extra

Applicable Law Checklist and Building Permit Application; HVAC Design Summary, heat-loss/gain and SB-12 Energy Efficiency Design Summary; Durham Region water/sewer connection approval and development charge forms; TARION registration, Roadway Restoration Deposit Form where applicable; Approved site plan, survey, grading, structural and architectural drawings; Plumbing, HVAC and any on-site sewage plans when required

Official sources behind this page

Permit decisionNew home requires permit and complete servicing/energy design

Oshawa's Building By-law Schedule C residential new construction application requires Applicable Law Checklist, HVAC Design Summary including heat loss/gain and SB-12 EEDS, Regional Municipality of Durham sewer/water approval, development charge information (City, Region, school boards), TARION registration, Roadway Restoration Deposit Form and applicable design info. Plans may include an approved site plan, survey, approved grading plan, architectural/structural/HVAC designs, on-site septic and plumbing details. Do not treat model certification as site-specific building permit issuance.

Official sourceCity of OshawaBuilding Permits · Residential permit triggers and project resources
Verified2026-11-09Open proof
Application route, if a permit appliesSubmit site, grading, HVAC/SB-12 and servicing documents

Choose New Construction-Residential or certified Production Builder project class as appropriate. Confirm zoning, lot, grade, access and Durham Region servicing before full submission. Prepare Schedule C forms, SB-12 energy/HVAC, designer documentation and development charge materials. Supply survey, site grading and scaled architectural/structural drawings. Budget $15.56/m² for house building class plus assessed development/service charges, and obtain permit before building.

Official sourceCity of OshawaBuilding Permits · Residential permit triggers and project resources
Verified2026-11-09Open proof
Local checks and submission documents2026 house fee $15.56/m²; development charges extra

Applicable Law Checklist and Building Permit Application; HVAC Design Summary, heat-loss/gain and SB-12 Energy Efficiency Design Summary; Durham Region water/sewer connection approval and development charge forms; TARION registration, Roadway Restoration Deposit Form where applicable; Approved site plan, survey, grading, structural and architectural drawings; Plumbing, HVAC and any on-site sewage plans when required

Official sourceCity of OshawaBuilding By-law 33-2009 as amended 118-2025: 2026 Schedule B · 2026 effective January 1 rates, minimum $160, Schedule C application documents
Verified2026-11-09Open proof
New house fee versus other costs$15.56/m² is a building class rate, not total project cost

The City's 2026 Schedule B item 23 sets the Group C house rate, while Schedule C separately lists development charges, TARION, Durham water/sewer and roadway restoration requirements.

Official sourceCity of OshawaBuilding By-law 33-2009 as amended 118-2025: 2026 Schedule B · 2026 effective January 1 rates, minimum $160, Schedule C application documents
Verified2026-11-09Open proof