- Calculate total panel face area
- Check heritage status
- Arrange the engineering assessment
- Submit the building permit if the threshold is met
Official sources behind this page
Oakville states that a building permit is required when accumulated panel face area is greater than or equal to five square metres.
An engineer must assess the building structure supporting the solar panels.
Oakville states that heritage approval is required for a heritage-designated property.