Project template
Your preparation checklist
Use it as a working list. The final submission still needs to match your actual scope and the City’s current requirements.
Wall removal / structural alteration
Planning record, not municipal approval. Confirm the conditions and official requirements for your property.
0 of 6 ready
Your progress is saved in this browser. Project reference, date and notes stay in this tab until you leave.
What to do next
- Confirm load-bearing status with a qualified designer or structural professional before removing finishes/supports.
- Draw floor plans showing walls to remain, remove and add, and structural member sizes and span direction.
- Design replacement beams, posts, foundation load path and fire/egress details where applicable.
- Submit Applicable Law, Schedule 1 and scaled site/interior plans via ePlans.
- Do not remove regulated structural supports before permit issuance; complete required inspections.
Official sources behind this page
A load-bearing wall, column or beam removal changes load transfer and may affect foundation supports, fire separation, stair/exit configuration and mechanical routing. Mississauga's structural floor drawing checklist requires size, type, grade, spacing, direction and span for framing and proposed walls/supports. Show floor and room uses, plumbing, ventilation, alarms and any new opening. A qualified engineer or designer may be needed depending on structure, size and framing; the City must determine the right application/design credentials.
Confirm load-bearing status with a qualified designer or structural professional before removing finishes/supports. Draw floor plans showing walls to remain, remove and add, and structural member sizes and span direction. Design replacement beams, posts, foundation load path and fire/egress details where applicable. Submit Applicable Law, Schedule 1 and scaled site/interior plans via ePlans. Do not remove regulated structural supports before permit issuance; complete required inspections.
Existing and proposed room/floor plans with wall demolition marked; Structural joist/beam/column/post/lintel positions, spans, grades and sizes; Proposed new structural beam/posts and load path to foundation; Adjacent opening, smoke/CO alarms, fire-rated walls and egress; Applicable Law Form and Schedule 1 Designer Information; Plumbing/HVAC modifications where connected to the wall
Mississauga's residential interior checklist requires joist, beam, column, post and lintel locations and their size, grade, spacing and direction of span.
Need the full project answer?