Project template
Your preparation checklist
Use it as a working list. The final submission still needs to match your actual scope and the City’s current requirements.
Shed / accessory structure
Planning record, not municipal approval. Confirm the conditions and official requirements for your property.
0 of 5 ready
Your progress is saved in this browser. Project reference, date and notes stay in this tab until you leave.
What to do next
- Confirm exact floor area, height, use and whether plumbing is proposed
- Check the property zoning and accessory-structure provisions
- Measure setbacks and lot coverage
- Prepare permit drawings if the exemption does not apply
- Check whether the lot borders a greenland zone and confirm additional setback rules
Official sources behind this page
The City lists a shed less than 15 m², one storey, free-standing, without plumbing and used for storage only as permit-exempt.
Mississauga lists sheds larger than 15 m², or sheds of any size containing plumbing, as permit-required. Its examples do not explicitly settle exactly 15 m² without plumbing, so confirm the boundary rather than assuming it is exempt.
Mississauga says accessory structures are subject to location, size, height, number and sometimes lot-coverage rules even when a building permit is not required.
Need the full project answer?
The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.
Open the shed / accessory structure guide