Scope before arithmetic
Make sure the fee belongs to your project.
The City's exact project checklist covers site setbacks and lot coverage, hard/soft landscaping, driveway width, AC unit location, window wells, foundation soil bearing, wall/footing thickness and engineered roof systems. Design documents include mechanical ventilation, Energy Efficiency Design Summary, water service sizing, supplemental forms, and truss layout review where applicable. Drawings must be scaled, metric and uploaded as individual greyscale unprotected PDFs in landscape format with matching title-block file names. Manufacturer engineered floor/truss members may need an Ontario professional engineer's signed/sealed specifications.
The City's exact project checklist covers site setbacks and lot coverage, hard/soft landscaping, driveway width, AC unit location, window wells, foundation soil bearing, wall/footing thickness and engineered roof systems. Design documents include mechanical ventilation, Energy Efficiency Design Summary, water service sizing, supplemental forms, and truss layout review where applicable. Drawings must be scaled, metric and uploaded as individual greyscale unprotected PDFs in landscape format with matching title-block file names. Manufacturer engineered floor/truss members may need an Ontario professional engineer's signed/sealed specifications.
Determine exact residential building class, lot zoning, site grading and servicing requirements. Complete applicable-law, designer, energy, mechanical and water sizing submissions. Draw metric site statistics including lot coverage, soft landscaping, driveway dimensions and setbacks. Prepare full foundation/floor/roof/structural/elevation and grading drawings, with engineer sealed components if needed. Upload each drawing as individual named PDF through ePlans and obtain City fee assessment and all approvals before starting construction.
Applicable Law Form, Schedule 1 and Supplementary Information Forms; SB-12 EEDS, Residential Mechanical Ventilation Design Summary, heat loss/duct calculations; Water Service Pipe Sizing and Single Dwelling Unit Information Letter; Dimensioned metric site plan with setback, coverage, driveway, parking and landscaped areas; Grading plan, foundation and structural floor framing plans; Roof framing/truss coordination, exterior elevations and wall sections; Engineer sealed supplier truss/floor specifications where applicable
Official sources behind this page
The City's exact project checklist covers site setbacks and lot coverage, hard/soft landscaping, driveway width, AC unit location, window wells, foundation soil bearing, wall/footing thickness and engineered roof systems. Design documents include mechanical ventilation, Energy Efficiency Design Summary, water service sizing, supplemental forms, and truss layout review where applicable. Drawings must be scaled, metric and uploaded as individual greyscale unprotected PDFs in landscape format with matching title-block file names. Manufacturer engineered floor/truss members may need an Ontario professional engineer's signed/sealed specifications.
Determine exact residential building class, lot zoning, site grading and servicing requirements. Complete applicable-law, designer, energy, mechanical and water sizing submissions. Draw metric site statistics including lot coverage, soft landscaping, driveway dimensions and setbacks. Prepare full foundation/floor/roof/structural/elevation and grading drawings, with engineer sealed components if needed. Upload each drawing as individual named PDF through ePlans and obtain City fee assessment and all approvals before starting construction.
Applicable Law Form, Schedule 1 and Supplementary Information Forms; SB-12 EEDS, Residential Mechanical Ventilation Design Summary, heat loss/duct calculations; Water Service Pipe Sizing and Single Dwelling Unit Information Letter; Dimensioned metric site plan with setback, coverage, driveway, parking and landscaped areas; Grading plan, foundation and structural floor framing plans; Roof framing/truss coordination, exterior elevations and wall sections; Engineer sealed supplier truss/floor specifications where applicable
The City's new-house checklist identifies SB-12 EEDS, Mechanical Ventilation Design Summary, heat loss/duct calculations and Water Service Pipe Sizing as required or conditional documents.
Need the full project answer?
The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.
Open the new house guide