Project template
Your preparation checklist
Use it as a working list. The final submission still needs to match your actual scope and the City’s current requirements.
0 of 6 ready
Your progress is saved in this browser. Come back whenever you’re ready.
What to do next
- Check zoning for garage location and size
- Prepare the site plan
- Prepare foundation and building drawings
- Submit through ePlans
Official sources behind this page
Mississauga publishes a dedicated accessory-structure permit checklist that includes detached garages.
The plan must show property lines, existing structures, proposed construction, dimensions and site information.
The City requires foundation, floor/framing, roof and elevation information for the garage permit package.
Need the full project answer?
The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.
Open the garage / carport guide