Scope before arithmetic
Make sure the fee belongs to your project.
The City requires a Demolition Control Permit for demolition of a dwelling unit. This is separate from the building demolition permit and may impose rebuilding deadlines. Residential demolition ePlans documents include Applicable Law Form, Demolition Control Permit Declaration, Schedule 1 Designer Information and a metric site plan marking all existing structures to remove/retain, property lines, right-of-way/easements, landscaped and paved areas. Extra rental, heritage, planning and utility conditions may apply.
Demolition of any dwelling unit is subject to Demolition Control By-law 0045-2019 in addition to the demolition building permit. Rental unit count and reconstruction requirements may impose separate approvals.
City residential demolition checklist requires Applicable Law Form, Demolition Control Permit Declaration, Schedule 1 Designer Information and a metric plan of lot, structures, easements and hard surfaces.
Demolition-control charge can be $0 for fewer than six residential units or six-plus non-rental units; six-plus rental units can require Section 99.1, Council and $160/unit. Building demolition permit fees remain separate.
Official sources behind this page
Demolition of any dwelling unit is subject to Demolition Control By-law 0045-2019 in addition to the demolition building permit. Rental unit count and reconstruction requirements may impose separate approvals.
City residential demolition checklist requires Applicable Law Form, Demolition Control Permit Declaration, Schedule 1 Designer Information and a metric plan of lot, structures, easements and hard surfaces.
Demolition-control charge can be $0 for fewer than six residential units or six-plus non-rental units; six-plus rental units can require Section 99.1, Council and $160/unit. Building demolition permit fees remain separate.
City Demolition Control By-law 0045-2019 covers dwelling units and can impose rebuilding timelines. Six-plus rental units may require a distinct Section 99.1 decision.
City checklist specifies metric plans identifying boundaries, existing buildings to remove/retain, easements and paved surfaces; other site clearances can apply.
Need the full project answer?
The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.
Open the demolition guide