Your preparation checklist
Use it as a working list. The final submission still needs to match your actual scope and the City’s current requirements.
0 of 5 ready
Your progress is saved in this browser. Come back whenever you’re ready.
What to do next
- Check basement-entrance zoning rules for the property
- Measure the proposed setbacks
- Prepare foundation and stair details
- Submit the complete permit package through ePlans
Official sources behind this page
Mississauga lists below-grade entrances and basement walkouts among projects that need a building permit.
The City’s document guide requires setbacks from property lines to the proposed below-grade entrance.
The basement/foundation plan must show soil bearing, wall and footing specifications, slab construction and step-down footing locations.