London, Ontario / Permit cost

What does a windows / doors permit cost?

See the published permit fee information BuildRules has verified for a windows / doors project in London, Ontario, with the source and limits visible.

Need the permit rules rather than just the fee? Read London windows / doors permit requirements and zoning checks

Check this for your address
Focused project answerLast verified Nov 9, 2026
Published fee information

No London building-permit fee for a genuine same-size window/door replacement without regulated structural changes. New or enlarged openings can require the B-7 residential alteration permit (general Group C index $3.68/m² with applicable Part 9 $260.37 minimum), but the City must classify exact scope and assessed area; do not quote a universal per-window fee.

Use this as a municipal-fee reference, not as the total project budget. Design, engineering, related applications and construction costs are separate.

Scope before arithmetic

Make sure the fee belongs to your project.

The published permit-required list explicitly names new/enlarged windows and doors. Same-size replacement appears separately among no-permit work. This distinction is about the scope: a 'replacement' that cuts a new opening or widens an existing one is not exempt. If a window is used as a bedroom exit or changes foundation load support, the Ontario Building Code and City review may require additional design. B-7 has Group C alterations fee categories, but no single flat window/door permit price is verified for each installation.

Permit decisionSame-size replacements exempt; new/enlarged openings need permit

London explicitly distinguishes new/enlarged windows and doors from same-size replacement. Structural changes, foundation openings and safety conditions can change the route.

Application route, if a permit appliesCompare existing and proposed opening, supports and egress

Measure existing and proposed opening: is it truly same size with no structural changes? For a new or enlarged opening, check headers, foundation or load-bearing support. Confirm any bedroom egress, fire or heritage constraints. Submit permit with opening dimensions and structural drawings if required. Wait for approvals and inspection stages before closing regulated structural work.

Local checks and submission documentsNo permit fee for genuine exempt same-size replacements

Existing and proposed window/door opening dimensions and placement; Whether framing, lintel/header or foundation is affected; New structural opening drawings and wall details where applicable; Bedroom egress and fire separation considerations if affected; Location relative to lot line and any heritage designation

Official sources behind this page

Permit decisionSame-size replacements exempt; new/enlarged openings need permit

London explicitly distinguishes new/enlarged windows and doors from same-size replacement. Structural changes, foundation openings and safety conditions can change the route.

Official sourceCity of LondonBefore you apply for a building permit · Residential permit triggers, exemptions and review timelines
Verified2026-11-09Open proof
Application route, if a permit appliesCompare existing and proposed opening, supports and egress

Measure existing and proposed opening: is it truly same size with no structural changes? For a new or enlarged opening, check headers, foundation or load-bearing support. Confirm any bedroom egress, fire or heritage constraints. Submit permit with opening dimensions and structural drawings if required. Wait for approvals and inspection stages before closing regulated structural work.

Official sourceCity of LondonBefore you apply for a building permit · Residential permit triggers, exemptions and review timelines
Verified2026-11-09Open proof
Local checks and submission documentsNo permit fee for genuine exempt same-size replacements

Existing and proposed window/door opening dimensions and placement; Whether framing, lintel/header or foundation is affected; New structural opening drawings and wall details where applicable; Bedroom egress and fire separation considerations if affected; Location relative to lot line and any heritage designation

Official sourceCity of LondonBuilding By-law B-7, Schedule A, effective March 1 2026 through February 28 2027 · 2026 fee schedule, residential alterations, demolition, structures, mechanical and plumbing
Verified2026-11-09Open proof
Enlargement changes the permit decisionNew or wider door/window openings are regulated work

London's published permit list requires new or enlarged windows and doors even though same-size replacements appear on the no-permit list.

Official sourceCity of LondonBefore you apply for a building permit · Residential permit triggers, exemptions and review timelines
Verified2026-11-09Open proof

Need the full project answer?

The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.

Open the windows / doors guide

After the rules, the right people.

Ready to build it?

No published windows / doors profiles serve London yet.

Confirm whether the openings change and whether structural work is involved.

Browse published profiles for this project in LondonAsk BuildRules about windows / doors

These profiles cannot receive direct BuildRules requests yet. You can contact listed businesses through their websites or save your project for review.