Scope before arithmetic
Make sure the fee belongs to your project.
The published permit-required list explicitly names new/enlarged windows and doors. Same-size replacement appears separately among no-permit work. This distinction is about the scope: a 'replacement' that cuts a new opening or widens an existing one is not exempt. If a window is used as a bedroom exit or changes foundation load support, the Ontario Building Code and City review may require additional design. B-7 has Group C alterations fee categories, but no single flat window/door permit price is verified for each installation.
London explicitly distinguishes new/enlarged windows and doors from same-size replacement. Structural changes, foundation openings and safety conditions can change the route.
Measure existing and proposed opening: is it truly same size with no structural changes? For a new or enlarged opening, check headers, foundation or load-bearing support. Confirm any bedroom egress, fire or heritage constraints. Submit permit with opening dimensions and structural drawings if required. Wait for approvals and inspection stages before closing regulated structural work.
Existing and proposed window/door opening dimensions and placement; Whether framing, lintel/header or foundation is affected; New structural opening drawings and wall details where applicable; Bedroom egress and fire separation considerations if affected; Location relative to lot line and any heritage designation
Official sources behind this page
London explicitly distinguishes new/enlarged windows and doors from same-size replacement. Structural changes, foundation openings and safety conditions can change the route.
Measure existing and proposed opening: is it truly same size with no structural changes? For a new or enlarged opening, check headers, foundation or load-bearing support. Confirm any bedroom egress, fire or heritage constraints. Submit permit with opening dimensions and structural drawings if required. Wait for approvals and inspection stages before closing regulated structural work.
Existing and proposed window/door opening dimensions and placement; Whether framing, lintel/header or foundation is affected; New structural opening drawings and wall details where applicable; Bedroom egress and fire separation considerations if affected; Location relative to lot line and any heritage designation
London's published permit list requires new or enlarged windows and doors even though same-size replacements appear on the no-permit list.