Scope before arithmetic
Make sure the fee belongs to your project.
The no-permit fixture replacement should not be generalized to new water service, new fixture locations, drains, sanitary backwater valves or storm connections. London B-7 3.6.2 distinguishes water/sanitary/storm buried piping for single/semi-detached houses ($260.37 flat), piping at other buildings ($3.68/m), sanitary backwater valve ($260.37 each) and other items. More than one mechanical/plumbing fee category may apply. City building/plumbing approval does not establish Electrical Safety Authority approval or separate municipal connections.
London distinguishes plumbing fixtures newly added, removed or moved from a same-location fixture replacement; buried drains, backwater valves and other systems have distinct permit fee classes.
List all fixtures and identify whether same-place replacements or a new/relocated layout. Identify buried piping, sanitary or storm drains and any backwater valve. Choose the correct City plumbing permit category rather than assuming one flat plumbing price. Apply with fixture/piping plans and determine whether separate municipal connection approval applies. Book plumbing inspections before closing walls or backfilling trench work.
Existing and proposed fixture and piping plan; Which plumbing fixtures are same-location replacements vs new/relocated; Sanitary, storm and water connections including buried pipe extent; Backwater valve or sump pump details if involved; Municipal street/service connection changes and inspection points
Official sources behind this page
London distinguishes plumbing fixtures newly added, removed or moved from a same-location fixture replacement; buried drains, backwater valves and other systems have distinct permit fee classes.
List all fixtures and identify whether same-place replacements or a new/relocated layout. Identify buried piping, sanitary or storm drains and any backwater valve. Choose the correct City plumbing permit category rather than assuming one flat plumbing price. Apply with fixture/piping plans and determine whether separate municipal connection approval applies. Book plumbing inspections before closing walls or backfilling trench work.
Existing and proposed fixture and piping plan; Which plumbing fixtures are same-location replacements vs new/relocated; Sanitary, storm and water connections including buried pipe extent; Backwater valve or sump pump details if involved; Municipal street/service connection changes and inspection points
London Building By-law B-7 2026 section 3.6.2 publishes specific standalone drainage class fees. The applicable permit fee depends on the building and actual plumbing scope.