Plan the stages separately
The published period is not the whole project.
London lists 10 business days for review of complete applications for single-detached, semi-detached and townhouse houses; review begins only after complete documentation, zoning/applied law checks and fee payment, and does not promise final occupancy or construction start.
Official sources behind this page
London requires new home building permits. B-7 2026 fee calculation varies by new house class and floor area; no uniform flat residential construction fee applies.
Identify dwelling class (single, semi, duplex or townhouse) and floor area in m². Check zoning, lot frontage, lot coverage, grading, driveway and servicing constraints. Prepare full architectural, structural, mechanical and energy package, with relevant qualified designers. Estimate permit charge using $14.13/m² or $12.29/m² as applicable, adding separate statutory charges. Submit a complete application, pay the assessed invoice and wait for issuance before construction and inspections.
Survey and site plan with setbacks, grading, driveway and utilities; New home foundation, floor, framing, roof, elevations and sections; Structural and designer qualification details; Mechanical/HVAC and energy-efficiency compliance submission; Stormwater, servicing and external approvals where required
London's published complete-application timeframe covers the specified house categories. Confirm the building class and full required package; other forms of residential construction can follow longer review periods.
London 2026 Schedule A 3.1 uses the chargeable floor area in m² multiplied by the relevant Group C service index; private septic and geothermal extras and development charges remain separate.