Scope before arithmetic
Make sure the fee belongs to your project.
The March 2026 fee schedule uses a service-index multiplied by chargeable construction floor area in square metres, rather than a universal fixed price. The City requires architectural, foundation/structural, mechanical, grading/site and energy-related documentation appropriate to home class. The initial legislative review for complete new detached/semi/townhouse applications is commonly 10 business days, but full drawings, zoning, applicable-law requirements and fees must be accepted before review. Part 9 minimum and other additional fees may apply.
London requires new home building permits. B-7 2026 fee calculation varies by new house class and floor area; no uniform flat residential construction fee applies.
Identify dwelling class (single, semi, duplex or townhouse) and floor area in m². Check zoning, lot frontage, lot coverage, grading, driveway and servicing constraints. Prepare full architectural, structural, mechanical and energy package, with relevant qualified designers. Estimate permit charge using $14.13/m² or $12.29/m² as applicable, adding separate statutory charges. Submit a complete application, pay the assessed invoice and wait for issuance before construction and inspections.
Survey and site plan with setbacks, grading, driveway and utilities; New home foundation, floor, framing, roof, elevations and sections; Structural and designer qualification details; Mechanical/HVAC and energy-efficiency compliance submission; Stormwater, servicing and external approvals where required
Official sources behind this page
London requires new home building permits. B-7 2026 fee calculation varies by new house class and floor area; no uniform flat residential construction fee applies.
Identify dwelling class (single, semi, duplex or townhouse) and floor area in m². Check zoning, lot frontage, lot coverage, grading, driveway and servicing constraints. Prepare full architectural, structural, mechanical and energy package, with relevant qualified designers. Estimate permit charge using $14.13/m² or $12.29/m² as applicable, adding separate statutory charges. Submit a complete application, pay the assessed invoice and wait for issuance before construction and inspections.
Survey and site plan with setbacks, grading, driveway and utilities; New home foundation, floor, framing, roof, elevations and sections; Structural and designer qualification details; Mechanical/HVAC and energy-efficiency compliance submission; Stormwater, servicing and external approvals where required
London's published complete-application timeframe covers the specified house categories. Confirm the building class and full required package; other forms of residential construction can follow longer review periods.
London 2026 Schedule A 3.1 uses the chargeable floor area in m² multiplied by the relevant Group C service index; private septic and geothermal extras and development charges remain separate.
Need the full project answer?
The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.
Open the new house guide