Scope before arithmetic
Make sure the fee belongs to your project.
Interior scope matters: replacing cabinets alone is not comparable to creating bedrooms, modifying exits, adding plumbing or altering beams. London lists finishing basement living space and changing room use as permit triggers. For an existing Group C dwelling, B-7 2026 uses SI $3.68/m² for alterations to existing floor area, with the Part 9 minimum and other fees applicable. A new additional residential unit follows a separate code review and can affect egress, fire separation, parking and zoning. Drawings and inspection stages follow the actual scope.
London distinguishes permit-required layout, structural, plumbing and room-use changes from painting, cabinets and other finishes. Residential Group C alteration fees follow area and minimum charge.
Separate decorating-only work from permit-required changes to walls, rooms, plumbing or insulation. Measure altered existing residential floor area in m² and identify applicable fee category. Prepare existing and proposed plans with beams, openings, HVAC/plumbing and safety details. Check if work creates an additional residential unit, which requires a different review. Submit permit when needed and arrange inspections before concealing regulated work.
Existing/proposed room layout with dimensions and occupancy; Walls, beams, posts and any proposed openings; Plumbing, heating, insulation, ventilation and fire safety changes; Stair and door/window egress details as applicable; Floor area to be altered and qualified designer details
Official sources behind this page
London distinguishes permit-required layout, structural, plumbing and room-use changes from painting, cabinets and other finishes. Residential Group C alteration fees follow area and minimum charge.
Separate decorating-only work from permit-required changes to walls, rooms, plumbing or insulation. Measure altered existing residential floor area in m² and identify applicable fee category. Prepare existing and proposed plans with beams, openings, HVAC/plumbing and safety details. Check if work creates an additional residential unit, which requires a different review. Submit permit when needed and arrange inspections before concealing regulated work.
Existing/proposed room layout with dimensions and occupancy; Walls, beams, posts and any proposed openings; Plumbing, heating, insulation, ventilation and fire safety changes; Stair and door/window egress details as applicable; Floor area to be altered and qualified designer details
The general 10-business-day review stream applies to the City's specified house categories only. Commercial, multi-residential and larger buildings can fall under other published timelines. Confirm scope and classification.
London's before-apply permit list exempts cosmetic work, but lists interior alterations, basement finishing and changes to wall/rooms, insulation and plumbing as permit-required.