Scope before arithmetic
Make sure the fee belongs to your project.
The City's permit trigger list distinguishes a new HVAC system, changes to furnace ducts and rooftop replacement from an exempt higher-efficiency replacement furnace. Do not treat every equipment swap or fuel change as exempt. London B-7 Schedule A 3.6.1 prices standalone Group C single/detached/semi HVAC at $260.37; other buildings use a $2.46/m² service index, and make-up-air/rooftop units can add a separate $260.37. Electrical Safety Authority and fuel/gas compliance are different from City building permission.
London requires a permit for heating/air conditioning systems and altered furnace ducts. Its no-permit list includes higher-efficiency furnace replacement, but the exemption does not automatically cover altered ducts or fuel change.
Distinguish a higher-efficiency furnace equipment replacement from changes in furnace ducts, heat source or roof-mounted units. Identify the exact residential or non-residential fee classification. Document equipment, duct, venting and mechanical changes and designer qualifications. Submit the City building application where required and check separate ESA, fuel and utility work. Arrange permit-listed inspections and preserve approved drawings at the site.
Existing and proposed equipment type, fuel, size and capacity; Whether ducts, vents, combustion air or distribution changes; Rooftop load and attachment details, if relevant; Heat-loss/gain and other mechanical design appropriate to work; Confirm separate ESA and fuel safety permissions
Official sources behind this page
London requires a permit for heating/air conditioning systems and altered furnace ducts. Its no-permit list includes higher-efficiency furnace replacement, but the exemption does not automatically cover altered ducts or fuel change.
Distinguish a higher-efficiency furnace equipment replacement from changes in furnace ducts, heat source or roof-mounted units. Identify the exact residential or non-residential fee classification. Document equipment, duct, venting and mechanical changes and designer qualifications. Submit the City building application where required and check separate ESA, fuel and utility work. Arrange permit-listed inspections and preserve approved drawings at the site.
Existing and proposed equipment type, fuel, size and capacity; Whether ducts, vents, combustion air or distribution changes; Rooftop load and attachment details, if relevant; Heat-loss/gain and other mechanical design appropriate to work; Confirm separate ESA and fuel safety permissions
London lists a higher-efficiency replacement furnace as no-permit work. Its permit-required list separately names furnace duct alterations, HVAC systems and rooftop equipment, so classify the full scope.
Need the full project answer?
The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.
Open the heating and ventilation guide