Plan the stages separately
The published period is not the whole project.
London generally lists 10 business days for initial review of a complete detached residential garage permit. Corrections, zoning, grading or other approvals can extend issuance.
Official sources behind this page
London requires a building permit for detached garages and applies combined accessory lot coverage, yard, height and setback restrictions; a shed-specific exemption does not automatically approve a garage.
Confirm whether the project is detached garage, attached carport or a small storage shed; different rules can apply. Calculate combined accessory building coverage; the City lists a 10% residential-lot maximum. Verify interior/rear-yard location, 0.6 m minimum setbacks and height rule or approved alternatives. Prepare foundation/framing/elevation plans and site survey, and identify plumbing. Apply for the appropriate permit, confirm $260.37 or $409.14 fee plus any plumbing surcharge, and book the listed inspections.
Lot survey or site plan with boundary distances and building footprint; Combined lot coverage of existing and proposed accessory structures; Floor area, building height, roof/framing, foundations and use; Existing house type, attachment and whether plumbing is proposed; Driveway and lot grading/drainage plan where applicable
The City's published timelines specify 10 business days for detached garages serving houses, measured from a complete application. Do not apply this timeframe to other garage types; corrections, approvals and final issuance may take longer.
The City's common homeowner guidance sets combined accessory-structure area at no more than 10% of lot area in residential zones, ordinary 0.6 m side/rear setback and 4 m height rule, with property-specific exceptions.