London, Ontario / Permit cost

What does a change of use permit cost?

See the published permit fee information BuildRules has verified for a change of use project in London, Ontario, with the source and limits visible.

Need the permit rules rather than just the fee? Read London change of use permit requirements and zoning checks

Check this for your address
Focused project answerLast verified Nov 9, 2026
Published fee information

London B-7 Schedule A 2026 administrative section 4(g): $260.37 flat for Change of Use with no construction. Alterations, different occupancy classification, other fire/health approvals and business licensing may add fees.

Use this as a municipal-fee reference, not as the total project budget. Design, engineering, related applications and construction costs are separate.

Scope before arithmetic

Make sure the fee belongs to your project.

Before committing to a new use, confirm London's Zoning By-law Z.-1 permits the proposed occupancy at that address. A change in use can affect exits, fire separation, accessibility, occupant load and mechanical ventilation even where no walls are moved. London Business Hub says Building Services and Fire Prevention may need to review commercial occupancy and fire inspections. The $260.37 no-construction fee is not an all-in cost where renovation or use-specific licences are required.

Permit decisionChange-of-use permit even without construction

London lists changes to a building's purpose as a permit trigger and has a $260.37 no-construction change-of-use permit category. Other construction or life-safety approvals can be required.

Application route, if a permit appliesConfirm zoning, existing and proposed occupancy first

Record current legally approved use and exact proposed new activity. Check zoning at the address with London's zoning office or Business Hub. Ask Building Services whether Change of Use without Construction or a construction/alteration permit applies. Prepare fire/life-safety, accessibility and layout documents for the new occupancy as instructed. Budget $260.37 only for the no-construction change-of-use class; obtain any separate permits before occupying.

Local checks and submission documentsNo-construction change-of-use $260.37 in 2026

Existing lawful occupancy and planned new use at this property; Floor area, occupant load and use-specific zoning requirements; Fire exits, alarm/sprinkler and fire separation changes; Accessibility and HVAC changes if use classification changes; Construction scope, even if no physical work is planned

Official sources behind this page

Permit decisionChange-of-use permit even without construction

London lists changes to a building's purpose as a permit trigger and has a $260.37 no-construction change-of-use permit category. Other construction or life-safety approvals can be required.

Official sourceCity of LondonBefore you apply for a building permit · Residential permit triggers, exemptions and review timelines
Verified2026-11-09Open proof
Application route, if a permit appliesConfirm zoning, existing and proposed occupancy first

Record current legally approved use and exact proposed new activity. Check zoning at the address with London's zoning office or Business Hub. Ask Building Services whether Change of Use without Construction or a construction/alteration permit applies. Prepare fire/life-safety, accessibility and layout documents for the new occupancy as instructed. Budget $260.37 only for the no-construction change-of-use class; obtain any separate permits before occupying.

Official sourceCity of LondonBefore you apply for a building permit · Residential permit triggers, exemptions and review timelines
Verified2026-11-09Open proof
Local checks and submission documentsNo-construction change-of-use $260.37 in 2026

Existing lawful occupancy and planned new use at this property; Floor area, occupant load and use-specific zoning requirements; Fire exits, alarm/sprinkler and fire separation changes; Accessibility and HVAC changes if use classification changes; Construction scope, even if no physical work is planned

Official sourceCity of LondonBuilding By-law B-7, Schedule A, effective March 1 2026 through February 28 2027 · 2026 fee schedule, residential alterations, demolition, structures, mechanical and plumbing
Verified2026-11-09Open proof
No-construction occupancy change$260.37 is a specific no-construction permit category

B-7 2026 Schedule A 4(g) lists $260.37 flat for Permit for Change of Use when no construction is proposed. It is not the fee for an alteration requiring other permits.

Official sourceCity of LondonBefore you apply for a building permit · Residential permit triggers, exemptions and review timelines
Verified2026-11-09Open proof

Need the full project answer?

The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.

Open the change of use guide