London, Ontario / Permit cost

What does a basement entrance / walkout permit cost?

See the published permit fee information BuildRules has verified for a basement entrance / walkout project in London, Ontario, with the source and limits visible.

Need the permit rules rather than just the fee? Read London basement entrance / walkout permit requirements and zoning checks

Check this for your address
Focused project answerLast verified Nov 9, 2026
Published fee information

No standalone London basement-walkout flat fee established in B-7. An existing Group C dwelling alteration can be assessed by the $3.68/m² alteration index, subject to $260.37 Part 9 minimum, while separate underpinning ($18.45 per linear m) and shoring ($13.53 per linear m) classes may apply when included. Confirm the actual combination and invoice with Building Services.

Use this as a municipal-fee reference, not as the total project budget. Design, engineering, related applications and construction costs are separate.

Scope before arithmetic

Make sure the fee belongs to your project.

A new walkout can change a foundation wall, grade, egress, staircase, guards and surface drainage. London explicitly lists below-grade entrances, basement walkouts, new/enlarged windows/doors and underpinning as permit-required categories. Plans should show the actual opening, basement floor and lot grade, retaining elements, stairs, nearby utilities and where runoff will go. Basement apartment or additional residential unit use is a separate permitting issue. Group C alteration SI and additional standalone underpinning/shoring categories can affect fee when those scopes are included, but no universal walkout price is established.

Permit decisionBelow-grade entrance is permit-required foundation work

London's permit list names below-grade entrances and foundation alterations; excavation, retaining walls, drainage and possible second-unit use must be reviewed in the same project scope.

Application route, if a permit appliesSubmit foundation, entrance-stair and grading/drainage plans

Confirm the entrance is a below-grade walkout and whether it creates another dwelling unit. Locate property boundaries, foundation opening and exterior grade/underground utilities. Obtain suitable structural and drainage plans for foundation opening and steps/retaining works. Ask Building Services to classify renovation versus separate underpinning/shoring charges; do not assume one fee. Submit permit and wait for approval before excavation or cutting the foundation; book inspections.

Local checks and submission documentsNo single 2026 walkout fee; permit class depends on scope

Site plan with foundation entrance location, lot lines and exterior grade; Existing and proposed below-grade opening, structural header and support details; Stairs, landings, retaining wall, guards and handrail plans; Surface drainage, below-grade sump/waterproofing and nearby utility lines; Whether entrance serves existing dwelling or proposed additional residential unit

Official sources behind this page

Permit decisionBelow-grade entrance is permit-required foundation work

London's permit list names below-grade entrances and foundation alterations; excavation, retaining walls, drainage and possible second-unit use must be reviewed in the same project scope.

Official sourceCity of LondonBefore you apply for a building permit · Residential permit triggers, exemptions and review timelines
Verified2026-11-09Open proof
Application route, if a permit appliesSubmit foundation, entrance-stair and grading/drainage plans

Confirm the entrance is a below-grade walkout and whether it creates another dwelling unit. Locate property boundaries, foundation opening and exterior grade/underground utilities. Obtain suitable structural and drainage plans for foundation opening and steps/retaining works. Ask Building Services to classify renovation versus separate underpinning/shoring charges; do not assume one fee. Submit permit and wait for approval before excavation or cutting the foundation; book inspections.

Official sourceCity of LondonBefore you apply for a building permit · Residential permit triggers, exemptions and review timelines
Verified2026-11-09Open proof
Local checks and submission documentsNo single 2026 walkout fee; permit class depends on scope

Site plan with foundation entrance location, lot lines and exterior grade; Existing and proposed below-grade opening, structural header and support details; Stairs, landings, retaining wall, guards and handrail plans; Surface drainage, below-grade sump/waterproofing and nearby utility lines; Whether entrance serves existing dwelling or proposed additional residential unit

Official sourceCity of LondonBuilding By-law B-7, Schedule A, effective March 1 2026 through February 28 2027 · 2026 fee schedule, residential alterations, demolition, structures, mechanical and plumbing
Verified2026-11-09Open proof
Structural opening and drainageDo not excavate or cut foundations before permit approval

The City identifies foundation alterations, new door openings, basement walkouts and underpinning as separately permit-triggering work, with additional site drainage considerations.

Official sourceCity of LondonBefore you apply for a building permit · Residential permit triggers, exemptions and review timelines
Verified2026-11-09Open proof

Need the full project answer?

The main guide keeps the permit trigger, zoning questions, documents, fees, timing and next steps together.

Open the basement entrance / walkout guide

After the rules, the right people.

Ready to build it?

No published basement entrance / walkout profiles serve London yet.

Review grading, foundation work and any engineering requirements first.

Browse published profiles for this project in LondonAsk BuildRules about basement entrance / walkout

These profiles cannot receive direct BuildRules requests yet. You can contact listed businesses through their websites or save your project for review.

Contractor serving London? Help homeowners understand the work you do and where you work.

Find or add my business